29.08.2014 Views

Book 1 - City of St. Petersburg

Book 1 - City of St. Petersburg

Book 1 - City of St. Petersburg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTENT:<br />

BASIS OF DESIGN BOOK 1<br />

1<br />

2<br />

INTRODUCTION<br />

Executive <strong>St</strong>atement<br />

Background<br />

Purpose <strong>of</strong> Report<br />

Description <strong>of</strong> Work Performed<br />

Organization <strong>of</strong> Report<br />

EXECUTIVE SUMMARY<br />

Introduction<br />

Definitions<br />

Component Summary<br />

Cost Summary<br />

A/E Team Organizational Chart<br />

Project Schedule<br />

1 - 1<br />

1 - 2<br />

1 - 5<br />

1 - 6<br />

1 - 7<br />

2 - 1<br />

2 - 2<br />

2 - 8<br />

2 - 10<br />

2 - 12<br />

2 - 13<br />

3<br />

GENERAL PLANNING CRITERIA<br />

Introduction<br />

Public Outreach Notes<br />

Underwater Feature Outreach Summary<br />

Uplands Usage Suggestions<br />

Pier Advisory Task Force Report Summary<br />

Site and Urban Design Criteria<br />

Existing Infrastructure<br />

Architectural Criteria<br />

Engineering Criteria<br />

Marina Criteria<br />

Underwater Feature Criteria<br />

Fire and Life Safety Requirements<br />

Accessibility and Code Requirements<br />

Permitting and Demolition<br />

3 - 1<br />

3 - 4<br />

3 - 16<br />

3 - 17<br />

3 - 20<br />

3 - 22<br />

3 - 54<br />

3 - 61<br />

3 - 84<br />

3 - 104<br />

3 - 108<br />

3 - 122<br />

3 - 126<br />

3 - 136<br />

4<br />

COMPONENT PLANNING CRITERIA<br />

Introduction<br />

Program Components<br />

Existing Conditions<br />

Component Descriptions<br />

4 - 1<br />

4 - 2<br />

4 - 4<br />

4 - 9<br />

5<br />

BASIS OF DESIGN CONCEPT ANALYSIS<br />

Introduction<br />

Engineering Narrative<br />

Basis <strong>of</strong> Design Concept Plans and Diagrams<br />

5 - 1<br />

5 - 2<br />

5 - 5<br />

6<br />

CONSTRUCTION MANAGER AT RISK:<br />

PROJECT IMPLEMENTATION<br />

Cost Estimate Process<br />

Local Business Enterprise Participation<br />

Preliminary Schedule<br />

6 - 1<br />

6 - 4<br />

6 - 15<br />

7<br />

OPERATING EXPENSE AND MAINTENANCE<br />

ESTIMATES<br />

Operating Expense and Maintenance Estimates<br />

7 - 1<br />

MICHAEL MALTZAN ARCHITECTURE, INC. 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!