PRELIMINARY SCHEDULE<br />

Activity Activity<br />

Activity Activity<br />

2012 2012 2013 2013 2014 2014 2015 2015<br />

ID ID<br />

Description Description Dur Dur<strong>St</strong>art <strong>St</strong>art Finish Finish<br />

M J JMA JS JO AN SD OJ NF DM JA FM MJ AJ MA JS JO AN SD OJNF DM JA FM MJ AJ MA JSJOA NSD OJ NF DM JA FM MJ AJ MA JSOC<br />

J A SOC<br />

Basis Basis <strong>of</strong> Design <strong>of</strong> Design Phase Phase<br />

BD-0010 BD-0010 Public Outreach Public Outreach & Input& Input 42 01JUN12* 42 01JUN12* 31JUL12 31JUL12 Public Outreach Public Outreach & Input& Input<br />

BD-0020 BD-0020 Programming Programming 34 02JUL12* 34 02JUL12* 17AUG12 17AUG12 Programming Programming<br />

BD-1010 BD-1010 Presentations Presentations by Shortlisted by Shortlisted CMs CMs 1 17JUL12* 1 17JUL12* 17JUL12 17JUL12 Presentations Presentations by Shortlisted by Shortlisted CMs CMs<br />

BD-1011 BD-1011 Award Project Award Project 1 18JUL12 1 18JUL12 18JUL12 18JUL12 Award Award Project Project<br />

BD-0060 BD-0060 Basis <strong>of</strong> Basis Design <strong>of</strong> Design Rpt - to Rpt Include - to Include Final Cost Final Plan Cost Plan 97 19JUL12 97 19JUL1204DEC12<br />

04DEC12<br />

Basis <strong>of</strong> Basis Design <strong>of</strong> Design Rpt - to Rpt Include - to Include Final Cost Final Plan Cost Plan<br />

Schematic Schematic Design Design Phase Phase<br />

SD-0020 SD-0020 Constructability Constructability & Cost & Plan Cost Review Plan Review 55 05DEC12 55 05DEC121FEB13<br />

21FEB13<br />

Constructability Constructability & Cost & Plan Cost Review Plan Review<br />

SD-0010 SD-0010 50% Schematic 50% Schematic Design Design Submission Submission 55 05DEC12 55 05DEC121FEB13<br />

21FEB13<br />

SD-0030 SD-0030 Schematic Schematic Design Design Phase Estimate Phase Estimate & Cost & Review Cost Review 20 22FEB13 20 22FEB1321MAR13<br />

21MAR13<br />

SD-0040 SD-0040 100% Schematic 100% Schematic Design Design 57 23JAN13 57 23JAN1311APR13<br />

11APR13<br />

SD-0050 SD-0050 Submittal SD Submittal Including Including Final SD Final Estimate SD Estimate 0 0 11APR13 11APR13<br />

Design Design Development Phase Phase<br />

DD-0020 DD-0020 Constructability Constructability Review Review 21 12APR13 21 12APR13 10MAY13 10MAY13<br />

DD-0010 DD-0010 50% Design 50% Design Development Development Submission Submission 30 12APR13 30 12APR13 23MAY13 23MAY13<br />

DD-0030 DD-0030 Design Design Development Development Phase Estimate Phase Estimate & Cost & Update Cost Update 20 03MAY13 20 03MAY131MAY13<br />

31MAY13<br />

DD-0040 DD-0040 100% Design 100% Design Development Development Submission Submission 28 24MAY13 28 24MAY13 03JUL13 03JUL13<br />

DD-0050 DD-0050 Submittal DD Submittal Including Including Final DD Final Estimate DD Estimate 0 0 03JUL13 03JUL13<br />

Geotechnical / Wind / Wind / Wave / Wave <strong>St</strong>udies <strong>St</strong>udies<br />

SD-0015 SD-0015 Bid/Award Bid/Award Geotech Geotech Survey/Fndn Survey/Fndn Borings Borings (Skanska) (Skanska) 22 05DEC12 22 05DEC12 07JAN13 07JAN13<br />

SD-0065 SD-0065 Wind <strong>St</strong>udies Wind <strong>St</strong>udies (Arch/Engr) (Arch/Engr) 132 05DEC12 132 05DEC12 11JUN13 11JUN13<br />

SD-0070 SD-0070 Wave <strong>St</strong>udies Wave <strong>St</strong>udies (Arch/Engr) (Arch/Engr) 132 05DEC12 132 05DEC12 11JUN13 11JUN13<br />

SD-0025 SD-0025 Geotech Geotech Survey Survey & Fndn & Borings Fndn Borings (Skanska) (Skanska) 88 08JAN13 88 08JAN1309MAY13<br />

09MAY13<br />

SD-0035 SD-0035 Issue Geotech Issue Geotech Survey/Fndn Survey/Fndn Borings Borings Rpt (Skanska) Rpt (Skanska) 22 10MAY13 22 10MAY13 11JUN13 11JUN13<br />

Construction Document Document Phase Phase<br />

CD-0020 CD-0020 Constructability Constructability Review Review 21 05JUL13 21 05JUL1302AUG13<br />

02AUG13<br />

CD-0010 CD-0010 50% Construction 50% Construction Document Document Submission Submission 46 05JUL13 46 05JUL1309SEP13<br />

09SEP13<br />

CD-0030 CD-0030 50% CD 50% Phase CD - Phase Initial - GMP Initial Submission GMP Submission 12 22AUG13 12 22AUG13 09SEP13 09SEP13<br />

CD-0040 CD-0040 100% Construction 100% Construction Document Document Submission Submission 53 10SEP13 53 10SEP13 21NOV13 21NOV13<br />

CD-0050 CD-0050 Final GMP Final GMP 32 01NOV13 32 01NOV13 17DEC13 17DEC13<br />

CD-0051 CD-0051 Award Contracts Award Contracts / Buyout / Buyout 22 18DEC13 22 18DEC13 20JAN14 20JAN14<br />

Permitting Permitting<br />

50% Schematic 50% Schematic Design Design Submission Submission<br />

Schematic Schematic Design Design Phase Estimate Phase Estimate & Cost & Review Cost Review<br />

100% Schematic 100% Schematic Design Design<br />

SD Submittal SD Submittal Including Including Final SD Final Estimate SD Estimate<br />

Constructability Constructability Review Review<br />

50% Design 50% Design Development Development Submission Submission<br />

Design Design Development Development Phase Estimate Phase Estimate & Cost & Update Cost Update<br />

100% Design 100% Design Development Development Submission Submission<br />

DD Submittal DD Submittal Including Including Final DD Final Estimate DD Estimate<br />

Bid/Award Bid/Award Geotech Geotech Survey/Fndn Survey/Fndn Borings Borings (Skanska) (Skanska)<br />

Wind <strong>St</strong>udies Wind <strong>St</strong>udies (Arch/Engr) (Arch/Engr)<br />

Wave <strong>St</strong>udies Wave <strong>St</strong>udies (Arch/Engr) (Arch/Engr)<br />

Geotech Geotech Survey Survey & Fndn & Borings Fndn Borings (Skanska) (Skanska)<br />

Issue Geotech Issue Geotech Survey/Fndn Survey/Fndn Borings Borings Rpt (Skanska) Rpt (Skanska)<br />

Constructability Constructability Review Review<br />

50% Construction 50% Construction Document Document Submission Submission<br />

50% CD 50% Phase CD - Phase Initial - GMP Initial Submission GMP Submission<br />

100% Construction 100% Construction Document Document Submission Submission<br />

Final GMP Final GMP<br />

Award Award Contracts Contracts / Buyout / Buyout<br />

SD-0055 Activity SD-0055 Activity SWFWMD SWFWMD Permitting Permitting Activity Activity<br />

261* 01NOV12* 261* 01NOV12* 08NOV13 08NOV13<br />

SWFWMD SWFWMD Permitting Permitting<br />

SD-0045 SD-0045 US Army US Corps Army <strong>of</strong> Corps Engineer <strong>of</strong> Engineer Permitting Permitting 289 21JAN13* 289 21JAN13* 07MAR14 07MAR14<br />

2012 2012 2013 2013 US Army 2014 US Corps Army 2014 <strong>of</strong> Corps Engineer <strong>of</strong> Engineer Permitting 2015 Permitting 2015<br />

ID ID<br />

Description Description Dur Dur<strong>St</strong>art <strong>St</strong>art Finish Finish<br />

M J JMA JS JO AN SD OJ NF DM JA FM MJ AJ MA JS JO AN SD OJNF DM JA FM MJ AJ MA JSJOA NSD OJ NF DM JA FM MJ AJ MA JSOC<br />

J A SOC<br />

SD-0060 SD-0060 Coast Guard Coast Permitting Guard Permitting 289 21JAN13* 289 21JAN13* 07MAR14 07MAR14<br />

Coast Guard Coast Permitting Guard Permitting<br />

<strong>St</strong>art Date<strong>St</strong>art Date<br />

01MAY12 01MAY12 STP3 STP3<br />

Sheet 1 <strong>of</strong> Sheet 2 1 <strong>of</strong> 2<br />

Finish Demolition Date Finish Demolition Date Phase Phase<br />

17AUG15 17AUG15<br />

Data DateData Date<br />

01MAY12 01MAY12<br />

SKANSKA SKANSKA USA Building, USA Building, Inc. Inc.<br />

DE-0010 DE-0010 Close Existing Close Existing Pier Pier 22 01MAY13* 22 01MAY13* 31MAY13 31MAY13<br />

Close Existing Close Existing Pier Pier<br />

Run DateRun Date 19NOV12 19NOV12 11:40 11:40<br />

Basis Basis <strong>of</strong> Design <strong>of</strong> Design<br />

DE-0011 DE-0011 Demo Inverted Demo Inverted Pyramid Pyramid (Above (Above Water) Water) 27 03AUG13 27 03AUG13 30AUG13 30AUG13<br />

Demo Inverted Demo Inverted Pyramid Pyramid (Above (Above Water) Water)<br />

<strong>St</strong>. <strong>Petersburg</strong> <strong>St</strong>. <strong>Petersburg</strong> Municipal Municipal Pier Replacement Pier Project Project<br />

DE-0012 DE-0012 Demo Existing Demo Existing Pier (Below Pier (Below Water) Water) 63 03SEP13 63 03SEP13 29NOV13 29NOV13<br />

Demo Existing Demo Existing Pier (Below Pier (Below Water) Water)<br />

Design Design & Construction & Schedule Schedule<br />

Construction © Phase Primavera © Phase Primavera Systems, Systems, Inc. Inc.<br />

CO-0010 CO-0010 Execute Execute GMP GMP 0 21JAN14 0 21JAN14<br />

Execute Execute GMP GMP<br />

CO-0022 CO-0022 Setup Survey Setup Survey Control Control Piers Piers 10 21JAN14 10 21JAN1403FEB14<br />

03FEB14<br />

Setup Survey Setup Survey Control Control Piers Piers<br />

CO-0021 CO-0021 Mobilize Mobilize & Setup & Environmental Setup Environmental Controls Controls 20 21JAN14 20 21JAN1417FEB14<br />

17FEB14<br />

Mobilize Mobilize & Setup & Environmental Setup Environmental Controls Controls<br />

CO-0023 CO-0023 Test Piles Test / Load Piles Test / Load Test 10 04FEB14 10 04FEB1417FEB14<br />

17FEB14<br />

Test Piles Test / Load Piles Test / Load Test<br />

CO-0024 CO-0024 Install Pier Install / Marina Pier / Marina Fndns & Fndns Bridge & Platform Bridge Platform 132 18FEB14 132 18FEB1422AUG14<br />

22AUG14 Install Pier Install / Marina Pier / Marina Fndns & Fndns Bridge & Bridge Platform Platform<br />

CO-0026 CO-0026 Install Elevated Install Elevated Pathway Pathway / Crown / / Crown Pier Fndns / Pier Fndns 132 18FEB14 132 18FEB1422AUG14<br />

22AUG14 Install Elevated Install Elevated Pathway Pathway / Crown / Crown / Pier Fndns / Pier Fndns<br />

CO-0031 CO-0031 Offsite Offsite Prefab Prefab Crown Architectural Crown Architectural Elements Elements 120 09JUN14 120 09JUN1425NOV14<br />

25NOV14<br />

Offsite Offsite Prefab Prefab Crown Crown Architectural Architectural Elements Elements<br />

CO-0025 CO-0025 Install Lower Install Pathways Lower Pathways 110 23JUN14 110 23JUN1425NOV14<br />

25NOV14<br />

Install Lower Install Pathways Lower Pathways<br />

CO-0027 CO-0027 Install Bridge/Elevated Install Bridge/Elevated Pathway Pathway & Arch & Elements Arch Elements 110 23JUN14 110 23JUN1425NOV14<br />

25NOV14<br />

Install Bridge/Elevated Install Bridge/Elevated Pathway Pathway & Arch & Elements Arch Elements<br />

CO-0028 CO-0028 Construct Construct Observation Observation Areas Areas 66 25SEP14 66 25SEP14 29DEC14 29DEC14<br />

Construct Construct Observation Observation Areas Areas<br />

CO-0029 CO-0029 Construct Construct Marina Marina Sections Sections 88 26NOV14 88 26NOV14 01APR15 01APR15<br />

Construct Construct Marina Marina Sections Sections<br />

CO-0030 CO-0030 Erect Crown Erect Crown 144 26NOV14 144 26NOV14 19JUN15 19JUN15<br />

Erect Crown Erect Crown<br />

CO-0032 CO-0032 Substantial Substantial Completion Completion 0 0 19JUN15 19JUN15<br />

Substantial Substantial Completion Completion<br />

CO-0034 CO-0034 Final Completion Final Completion 20 22JUN15 20 22JUN1520JUL15<br />

20JUL15<br />

Final Completion Final Completion<br />

CO-0040 CO-0040 Close Out Close - Grand Out - Opening Grand Opening 20 21JUL15 20 21JUL1517AUG15<br />

17AUG15<br />

Close Out Close - Grand Out - Opening Grand Opening<br />

MICHAEL MALTZAN ARCHITECTURE, INC. 6 - 15<br />

<strong>St</strong>art Date<strong>St</strong>art Date<br />

Finish Date Finish Date<br />

01MAY12 01MAY12 STP3 STP3 Sheet 2 <strong>of</strong> Sheet 2 2 <strong>of</strong> 2<br />

17AUG15 17AUG15