A third type of seal is intended to prevent or hinder intrusion in the underground facility after it<br />

has been backfilled and sealed. <strong>SKB</strong> judges that detailed technical solutions for this can wait.<br />

Conclusions in RD&D 2001 and its review<br />

<strong>SKB</strong>’s judgement in RD&D 2001 was that sufficient knowledge will exist regarding the design<br />

and construction of temporary seals once planned experiments are completed. Temporary seals<br />

in the form of plugs are included in the full-scale Backfill and Plug test and the Prototype<br />

Repository experiment at the Äspö HRL.<br />

Newfound knowledge since RD&D 2001<br />

Temporary seals in the deposition tunnels can be designed in different ways. The type of plug<br />

that has been installed in the Backfill and Plug test and the Prototype Repository experiment is<br />

a reinforced plug anchored in a slot in the rock around the tunnel. Another type is a friction plug<br />

which is held in place by the friction between the rock wall and the plug.<br />

The design of the two reinforced plugs installed in the Prototype Repository differs somewhat<br />

from the plug in the Backfill and Plug Test in that they lack a sealing ring of bentonite and have<br />

been cast in self-compacting concrete certified by the supplier. Friction plugs have not yet been<br />

tested in the Äspö HRL.<br />

<strong>Programme</strong><br />

Establishing performance requirements, technical solutions and a fabrication method for plugs<br />

is part of the development programme being conducted by <strong>SKB</strong> with regard to backfilling and<br />

closure of the deep repository. In a completed feasibility study within the framework of this<br />

programme, it was concluded that there is a need to conduct an inventory and evaluation of<br />

possible concepts for seals, both with temporary and permanent function. The choice of concept<br />

for seals is dependent on, among other things, which method is used for excavation of the rock<br />

and which backfilling concept is used.<br />

<strong>SKB</strong> is participating in an integrated project within the EU’s Sixth Framework <strong>Programme</strong><br />

for research, technological development and demonstration (Engineering Studies and<br />

Demonstrations of Repository Designs, Esdred) /10-8/. A part of the project deals with<br />

development and validation of technology for development of temporary seals made of<br />

low-pH cementitious materials. For example, the programme includes application and<br />

qualification of a temporary seal made of low-pH shotcrete.<br />

A technical solution for sealing of horizontal deposition tunnels will be arrived at prior to the<br />

demonstration of KBS-3H, with horizontal deposition of the canisters, that is planned at the<br />

Äspö HRL in 2006. According to current plans, at least one of the deposition tunnels will be<br />

sealed with a friction plug made of shotcrete based on low-pH cement. The KBS-3H method is<br />

described in greater detail in section 10.7.<br />

10.5 Sealing of investigation boreholes<br />

10.5.1 Requirements and premises<br />

Rock excavation and operation of the underground part of the deep repository facility will have<br />

only a limited impact on the safety performance of the rock and the other barriers. Investigation<br />

holes from the surface and from tunnels in the deep repository must therefore be cleaned and<br />

sealed no later than at the closure of the deep repository.<br />

124 RD&D-<strong>Programme</strong> <strong>2004</strong>