10.11.2014 Views

RD&D-Programme 2004 - SKB

RD&D-Programme 2004 - SKB

RD&D-Programme 2004 - SKB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2003 <strong>2004</strong> 2005 2006<br />

2007 2008<br />

Phases in canister<br />

development<br />

Process development<br />

Process window<br />

Verification<br />

Demonstration Account Compilation Regulatory review and possible supplementary work<br />

Encapsulation plant<br />

Facility design<br />

Layout and system<br />

documents phase D<br />

Final design<br />

phase D<br />

Application<br />

documents<br />

Layout and system documents<br />

phase C<br />

Procurement<br />

documention<br />

Canister report<br />

Canister development<br />

Sealing (welding)<br />

Development process<br />

and machine<br />

Parameter<br />

studies<br />

Choise of<br />

welding method<br />

Evaluation Welding reports<br />

Possible supplementation of permit application<br />

Continued welding of copper lids with chosen method<br />

Nondestructive<br />

testing (NDT)<br />

of welds<br />

Development of methods<br />

and equipment NDT for trial series NDT reports<br />

Possible supplementation of permit application<br />

Continued NDT of welds<br />

Reliability<br />

Statistical model<br />

Reliability in NDT of welds<br />

Background material<br />

for SR-Can<br />

Components<br />

Fabrication technology<br />

Fabrication methods at different suppliers<br />

and gradual development of methods<br />

Fabrication report<br />

Verification and demonstration<br />

of fabrication methods<br />

Verified<br />

fabrication<br />

methods<br />

Safety assessment<br />

SR-Can and SR-Site<br />

SR-Can interim report<br />

SR-Can report<br />

SR-Can<br />

report<br />

SR-Site report<br />

Qualification<br />

NDT, welding and<br />

fabrication<br />

Draft of plan<br />

for qualification<br />

Summarizing account<br />

Plan for<br />

qualification finished<br />

Preparations for qualification, inspection organization<br />

Accounts RD&D <strong>2004</strong><br />

Application<br />

encapsulation<br />

plant<br />

RD&D 2007<br />

Application<br />

deep<br />

repository<br />

2003 <strong>2004</strong> 2005 2006 2007 2008<br />

Figure 8. Plan for encapsulation, 2003–2008.<br />

During the period 2006–2008, the principal emphasis will be on supporting the submitted<br />

application with whatever clarifications and supplementary material the authorities may request,<br />

to continue working with design and technology development, and to adapt the encapsulation to<br />

resource-effective production. A status report on encapsulation is planned in conjunction with<br />

the permit application for the deep repository.<br />

Granting of a permit entails that the site for the encapsulation plant and the main features of its<br />

design are approved. As far as technical optimization on the detailed level and adaptation of the<br />

process to resource-effective production are concerned, considerable degrees of freedom will<br />

remain even after a siting decision. An example is serial production and assembly of canister<br />

components. How this is organized and where it will take place are questions that will be<br />

decided later on.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 379

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!