Table 4. Current situation and preliminary interim goals for certain design issues, according to Table 3A.<br />

Design issue/<br />

subsystem<br />

Current situation, reference D1 – permit application for<br />

encapsulation plant<br />

D2 – permit application for deep<br />

repository<br />

Infrastructure and layout for facility<br />

parts above ground<br />

Location and disposition of functions<br />

in relation to local conditions.<br />

Generic design basis and reference<br />

solutions exist. First site adaptation<br />

done during step D0.<br />

Alternative locations and preliminary<br />

configurations presented.<br />

Environmental aspects preliminarily<br />

analyzed.<br />

Main alternative chosen and<br />

justified. Configuration presented<br />

for this alternative. Environmental<br />

aspects analyzed and described.<br />

Access alternatives<br />

Various combinations of shafts and<br />

inclined tunnel (ramp) can be chosen<br />

for transport and communications.<br />

Comparative analyses done of<br />

alternative solutions.<br />

Reference: Separate shafts for<br />

personnel transport and rock<br />

hoisting, ramp for transport of<br />

transport casks with canisters.<br />

Locations for shafts, or route for<br />

ramp, preliminarily determined and<br />

justified. Environmental aspects<br />

preliminarily analyzed.<br />

Locations and dimensions for<br />

shafts chosen. Possible execution<br />

described. Revised route for ramp<br />

described. Environmental aspects<br />

described.<br />

Rock spoil<br />

Handling procedure for excavated<br />

rock from removal to end use.<br />

Location of facilities, transport roads.<br />

Handling alternatives, preliminary<br />

market situation etc have been<br />

analyzed.<br />

Proposals for handling procedure<br />

studied, alternative locations of<br />

facilities presented. Environmental<br />

aspects preliminarily analyzed.<br />

Handling procedure and technical<br />

solution presented for prioritized<br />

alternative. Environmental aspects<br />

analyzed and described.<br />

Ventilation below ground<br />

System solutions and rating. Preliminary assessment of the<br />

ventilation requirement is included<br />

in the reference design.<br />

Preliminary rating of the ventilation<br />

system based on the requirement<br />

for the facility’s underground part,<br />

including principles for design of fire<br />

ventilation and fire cells.<br />

Ventilation system rated for<br />

ventilation requirement of the<br />

facility’s underground part,<br />

including principles for design<br />

of fire ventilation and fire cells.<br />

Main and construction documents<br />

Requisite documents for procurement<br />

of contracts for site preparation and<br />

infrastructure.<br />

Documents for executing the works<br />

on the site prepared, checked and<br />

approved.<br />

Handling procedure and technical<br />

solutions chosen and approved.<br />

Ventilation requirement during<br />

construction and operating<br />

phases clarified so that requisite<br />

procurements can take place as<br />

needed.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 393