Newfound knowledge since RD&D 2001<br />

Experience within the framework of the conclusions in RD&D 2001 is being documented.<br />

No new separate analysis of the canister factory has been done.<br />

<strong>Programme</strong><br />

The lessons learned from the trial fabrication of all canister parts will be applied to and<br />

influence the further development of the factory. The work of investigating and establishing<br />

acceptance criteria and testing methods will make it possible to specify modified equipment<br />

for NDT and other quality inspection more precisely. A more thorough evaluation of modified<br />

machinery and testing equipment will be done in cooperation with potential suppliers. This will<br />

provide opportunities for a more precise analysis of the factory’s layout and investment costs.<br />

If the development of friction stir welding shows that the technique may be suitable for sealing<br />

the canisters, the consequences of this need to be examined and weighed into factory layout and<br />

investment costs.<br />

In order to get a complete picture of potential uncertainties, a risk analysis will be conducted of<br />

operations in the planned canister factory.<br />

A detailed timetable coordinated with <strong>SKB</strong>’s main timetable will be prepared.<br />

A technical description of the canister factory will be appended to the permit application for<br />

the encapsulation plant. However, the siting work for the canister factory is not expected to be<br />

finished at the time of the permit application for the deep repository.<br />

64 RD&D-<strong>Programme</strong> <strong>2004</strong>