Encapsulation plant<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017<br />

<strong>SKB</strong><br />

Application KTL, MB<br />

PERMIT<br />

Application KTL<br />

PERMIT<br />

Safety assessments<br />

SR-Can<br />

Consultations, EIA<br />

Design<br />

Draft documents (Stage D)<br />

Authorities<br />

Government<br />

Municipality<br />

Deep repository<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017<br />

<strong>SKB</strong><br />

Site investigations<br />

Oskarshamn, Forsmark<br />

Safety assessments<br />

Preliminary evaluations<br />

APPLI-<br />

CATION<br />

Main documents<br />

Application KTL, MB<br />

Evaluation<br />

SR-Site<br />

PERMIT<br />

Engineering documents<br />

Construction<br />

Rock Buildings Installations Commissioning Trial operation<br />

APPLI-<br />

CATION<br />

Application KTL<br />

Documentation<br />

PERMIT<br />

Initial operation Initial operation<br />

Consultations, EIA<br />

Design<br />

Draft documents (Stage D) Main documents Engineering documents Documentation<br />

Authorities<br />

Government<br />

Municipality<br />

APPLI-<br />

CATION<br />

Construction, detailed characterization<br />

Rock Buildings Installations Commissioning Trial operation<br />

APPLI-<br />

CATION<br />

Figure 2. Timetable for the encapsulation plant and the deep repository, 2003–2017.<br />

• Application for a permit to build an encapsulation plant assumes co-siting at Clab. If the<br />

Clab siting is rejected as the main alternative, the timetable must be revised. The secondchoice<br />

alternative is a siting at Forsmark, which assumes that the deep repository is also<br />

located on this site.<br />

• The initiated site investigations for the deep repository can largely be carried out within the<br />

planned timeframe (by the middle of 2007), and with results favourable enough to warrant<br />

an application for a permit to build the deep repository on one of the sites. An outcome<br />

where additional candidate sites for the deep repository must instead be added to the siting<br />

programme would require revision of the timetable.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 365