<strong>Programme</strong><br />

Design step D, which includes design of the whole facility both above and below ground, has<br />

been divided into three substeps: D0, D1 and D2. The purpose is to include available information<br />

step by step. A summary of the scope and products of the steps is given in Table 11-1.<br />

Steps D0 and D1 are carried out in parallel with the initial site investigations (2002–<strong>2004</strong>)<br />

and step D2 is carried out in parallel with the complete site investigations (2005–2007).<br />

Layout D0 entails the start of site adaptation of the surface part and preparation of preliminary<br />

proposals for alternative locations in Oskarshamn and Forsmark. Figure 11-3 illustrates an<br />

example of a proposed layout of the operating area.<br />

In Layout D1, alternative functional solutions and technical solutions are further developed<br />

for e.g. operating areas and access alternatives for selected reference locations for the deep<br />

repository. In combination with this, a local site adaptation of the repository’s underground part<br />

to available geological information takes place. Proposals are presented for alternative layouts<br />

of this part. The local adaptation also entails that the surface and underground parts are coordinated.<br />

One document is compiled per site. The level of detail is roughly the same as in Layout<br />

E, but site-adapted. The underground layout comprises a basis for the preliminary safety evaluation<br />

that is presented at the end of the initial site investigation phase. Studies of environmental<br />

and societal impact are conducted.<br />

Layout D2, which is based on Layout D1 and the results of the site investigations, is more specific<br />

in that it describes various work and functional solutions for the surface and underground<br />

parts in detail. The placement of the underground part is verified by new available information,<br />

such as investigation results and site model version 2.2, updated reasons for choice of design,<br />

and updated engineering and design premises. Layout D2 will be described so that it serves<br />

as a basis for the safety assessment (SR-Site) that is included in the application for the deep<br />

repository.<br />

The design during the site investigation phase also includes devising detailed design premises<br />

and programme for the next phase, the construction phase.<br />

Table 11-1. Summary of the scope and products of the design steps.<br />

Design step Scope Products<br />

Layout E Combined non-site-adapted design. Facility description based on theoretical<br />

layouts for the surface and underground parts<br />

/11-6, 11-7, 11-8/.<br />

Layout D0<br />

Layout D1<br />

Layout D2<br />

Site-adapted design of the underground<br />

part.<br />

Site-adapted design of the underground<br />

part based on data from ISI and<br />

completed consultations.<br />

Continued site-adapted design of facility<br />

based on site data from CSI and taking<br />

into account safety assessment and EIA.<br />

Update of Layout D1 with respect to<br />

technical developments and result from<br />

design.<br />

Basis for execution of site preparation<br />

work and preparation of documents for<br />

construction of ramp and shaft.<br />

Compilation of possible positions and layouts<br />

for the surface part.<br />

Layout for selected alternatives for surface<br />

and underground part.<br />

Facility descriptions based on alternative<br />

layouts.<br />

Basis for preliminary safety evaluation.<br />

Layout of proposed facility with final site plan<br />

for surface part and final placement of ramp<br />

and shaft.<br />

Facility description based on proposed or<br />

approved layout.<br />

Background material for SR-Site.<br />

Supporting material for deep repository<br />

application.<br />

Supporting material for preparation of main<br />

and construction documents for ramp and<br />

shaft.<br />

136 RD&D-<strong>Programme</strong> <strong>2004</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!