Encapsulation plant<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017<br />

<strong>SKB</strong><br />

Application KTL, MB<br />

PERMIT<br />

Application KTL<br />

PERMIT<br />

Safety assessments<br />

SR-Can<br />

Consultations, EIA<br />

Design<br />

Draft documents (Stage D)<br />

Authorities<br />

Government<br />

Municipality<br />

Deep repository<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017<br />

<strong>SKB</strong><br />

Site investigations<br />

Oskarshamn, Forsmark<br />

Safety assessments<br />

Preliminary evaluations<br />

APPLI-<br />

CATION<br />

Main documents<br />

Building permit<br />

Application KTL, MB<br />

Evaluation<br />

SR-Site<br />

PERMIT<br />

Engineering documents<br />

Construction<br />

Rock Buildings Installations Commissioning Trial operation<br />

APPLI-<br />

CATION<br />

Application KTL<br />

Documentation<br />

Operating licence<br />

PERMIT<br />

Initial operation Initial operation<br />

Consultations, EIA<br />

Design<br />

Draft documents (Stage D) Main documents Engineering documents Documentation<br />

Authorities<br />

Government<br />

Municipality<br />

APPLI-<br />

CATION<br />

Building permit<br />

Construction, detailed characterization<br />

Rock Buildings Installations Commissioning Trial operation<br />

APPLI-<br />

CATION<br />

Operating licence<br />

Figure 2-2. Plans for the encapsulation plant and the deep repository <strong>2004</strong>–2017.<br />

<strong>SKB</strong>’s planning in the short term is dependent on the time required for the site investigations<br />

and for producing the site-specific supporting material (facility design, safety assessment, EIS)<br />

based on the results of these investigations. Producing and compiling this material is of high<br />

priority for <strong>SKB</strong>. The planning must also take into account the linkage between the facilities.<br />

This linkage means that the production of supporting material must be coordinated in important<br />

respects. In view of the construction times for the facilities, the licensing process for the<br />

encapsulation plant must lie slightly ahead of that for the deep repository. Much of the supporting<br />

material to be compiled for a permit application for the encapsulation plant is also relevant<br />

to the deep repository. According to the plans, a permit application for the encapsulation plant is<br />

supposed to be submitted in 2006 and for the deep repository at the end of 2008, see Figure 2-3.<br />