10.11.2014 Views

RD&D-Programme 2004 - SKB

RD&D-Programme 2004 - SKB

RD&D-Programme 2004 - SKB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

simulation program, and the body of statistics available for the analysis can thereby be increased<br />

considerably. The above process, which is described schematically in Figure 6-23, will take<br />

place along two parallel tracks that deal with sealing welds executed by EBW and FSW.<br />

The project at BAM is expected to be concluded during 2005 and the final report published in<br />

2006. Interim results from the study will be reported during this period.<br />

We intend to publish experience and results from nondestructive testing during the first half of<br />

2005.<br />

After the choice of welding method, we intend to start a feasibility study regarding the requirements<br />

for and possible usefulness of ultrasonic modelling. Plans call for the feasibility study to<br />

start during the second half of 2005.<br />

Digital<br />

radiography<br />

Survey of<br />

<strong>SKB</strong>’s system<br />

Modelling<br />

Simulation<br />

Optimization<br />

of methodology<br />

Defect description<br />

POD simulation<br />

NDT reliability<br />

Generation<br />

of defects<br />

NDT at <strong>SKB</strong><br />

Evaluation<br />

of defect<br />

incidence<br />

Results<br />

POD, ROC<br />

Figure 6-23. Flow chart (project “NDT Reliability” at BAM).<br />

86 RD&D-<strong>Programme</strong> <strong>2004</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!