25 Low- and intermediate-level waste<br />

Most of the waste from operation and decommissioning of the nuclear power plants is<br />

short-lived and low- and intermediate-level. During operation and decommissioning of the<br />

NPPs also long-lived low- and intermediate-level waste arises.<br />

25.1 Components of the LILW system<br />

The system for managing low- and intermediate-level waste (LILW) handles all radioactive<br />

materials from the NPPs, with the exception of the spent fuel. Waste that is so low-level that it<br />

can be disposed of by on-site shallow land burial at the NPPs is not included either.<br />

The LILW system can also manage the radioactive waste obtained from Studsvik, or waste from<br />

other use of radioactive materials in e.g. research and education and at hospitals and in industry.<br />

However, this lies beyond <strong>SKB</strong>’s undertaking for its owners and therefore requires that special<br />

agreements be signed. The waste can be treated and packaged at the NPPs and at Studsvik.<br />

Studsvik takes care of the institutional waste.<br />

<strong>SKB</strong>’s facilities for LILW today include the final repository for short-lived LILW from<br />

operation and maintenance of the NPPs (SFR), the interim storage facility for intermediate-level<br />

long-lived waste, core components, in Clab and the transportation system for LILW (Sigyn with<br />

transport casks, ATB).<br />

The LILW system will later be augmented with a final repository for radioactive waste from<br />

decommissioning of the Swedish NPPs and phase-out of other nuclear activities.<br />

The short-lived waste from decommissioning of NPPs is planned to be disposed of in an<br />

extension of SFR-1. In conjunction with the extension, a rearrangement is planned so that<br />

the entire SFR facility can be utilized for optimal disposal of waste from both operation and<br />

decommissioning.<br />

Long-lived LILW is interim-stored today at Clab, at the nuclear power plants and at Studsvik.<br />

The long-lived waste has a relatively small volume so far, but this will increase with the<br />

decommissioning of the NPPs. An extended operating time will also presumably result in<br />

increased volumes from maintenance and repairs. <strong>SKB</strong> is therefore planning for a dry interim<br />

storage of core components to relieve the load on Clab.<br />

The final repository for other long-lived waste is planned to be ready to receive waste in around<br />

2045, when most of the waste will be available for deposition, see Figure 25-1.<br />

<strong>SKB</strong>’s activities in the LILW field are financed in part with money from the Nuclear Waste<br />

Fund (the repository for decommissioning waste and the repository for other long-lived waste)<br />

and in part directly by the owners (existing repository for short-lived operational waste). The<br />

parts of <strong>SKB</strong>’s activities in this field that relate to Studsvik and other waste suppliers are<br />

financed separately.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 327