The important milestones are:<br />

• Applying for a permit to build the deep repository on the selected site.<br />

• Obtaining a permit to build the deep repository on this site.<br />

• Applying for a licence for operation of the deep repository.<br />

• Obtaining an operating licence.<br />

• Transitioning into regular operation after a period of initial operation.<br />

Time horizon 2008<br />

Figure 10 shows in greater detail the plan for the period 2003–2008, i.e. the remainder of the<br />

siting phase for the deep repository, up to the planned time of application. In addition to the<br />

site investigations, the figure presents the plans for design and the safety assessments of the<br />

deep repository, as well as important links between these activities. An equivalent plan for the<br />

parallel technology development work for the needs of the deep repository project is presented<br />

in section A4.4, Figure 12.<br />

The activities in the site investigation phase are aimed at gathering the material that is needed<br />

for a permit application. The main activities are as follows:<br />

Site Investigations<br />

• Complete initiated investigations in Forsmark.<br />

• Complete initiated investigations in Oskarshamn.<br />

• Produce descriptions of the investigated sites as a basis for site-adapted deep repository<br />

solutions, safety assessments and environmental impact statements.<br />

Design<br />

• Design facilities, systems and infrastructure for deep repositories on the investigated sites to<br />

a level that can serve as a basis for the facility descriptions and safety assessments that are to<br />

be included in the application.<br />

Safety assessment<br />

• Produce safety assessments for deep disposal on the investigated sites.<br />

Consultations and environmental impact assessment<br />

• Carry out statutory consultations and other communication with concerned parties and the<br />

public.<br />

• Produce the environmental impact statement that must accompany the application.<br />

These activities are described more thoroughly in sections A4.2–4.6.<br />

In the final part of the site investigation phase, an integrated evaluation of all background<br />

material is made in order to be able to:<br />

• Prioritize a site for the deep repository and justify this prioritization.<br />

• Assemble the permit application.<br />