10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Planning</strong> <strong>with</strong> LDA/LDC4.2 System componentsNoteExpansion compensationDue to heat dissipation at rated load, the busbars in the trunking unit expand. Tocompensate this expansion in length, you need to include expansion compensation units atdefined intervals when planning your horizontal installation.In the case of vertical installation, each trunking unit features expansion compensation.When planning expansion compensation for trunking units, please remember:• A straight trunking run <strong>with</strong>out expansion compensation between two junction units mustnot exceed 10 m in length.• A straight trunking run between a junction unit and the end cap must not exceed 25 m inlength. In the case of longer trunking run lengths, planning provision has to be madeaccordingly for expansion compensation units.123BoltExpansion compensationHookTrunking unit <strong>with</strong> expansion compensationTap-off pointsTap-off points are only possible on straight trunking units (both standard lengths and optionallengths possible). Options are:● Tap-off point on TOP: ...-AD● Tap-off point BOTTOM: ...-ADU● Tap-off points on TOP and BOTTOM: ...-ADO+UWith a trunking unit <strong>with</strong> a tap-off point at the TOP and BOTTOM, only one tap-off unit canbe used at a time. The required distance between tap-off points is 1 m.<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong>112 <strong>Planning</strong> Manual, 10/2007, A5E01541101-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!