10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Planning</strong> <strong>with</strong> LRC6.2 System components6.2.11 Tap-offs for power distributionThe LRC system has been designed for power transmission. However, poewr tap-off forloads can be created by adding straight trunking units <strong>with</strong> tap points and correspondingtap-off units to the LRC run.Figure 6-7Straight trunking unit <strong>with</strong> tap-off unitX = 0.50...3.00 mThe tap-off unit permits rated currents of up to 630 A. An equipment compartment (dashedline to the right of the tap-off unit) is built onto the tap-off unit. Project-specific switchgear(e.g. circuit-breakers) is installed in the compartment and connected - both electrically andmechanically - to the tap-off unit.Tap-off units are not designed for connection whilst the LRC system is live.All other characteristics and technical data can only be provided on request for specificprojects.<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong><strong>Planning</strong> Manual, 10/2007, A5E01541101-01 221

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!