10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Further information about planning7.5 <strong>Planning</strong> runsSystem Type of bracket Function Fixing distances 2)LRC• Support of weight of run1.5 m• Permit proper movement• For wall mounting• For ceiling mounting (-BVD)Fixing bracket <strong>with</strong>weight carrying capacity(-BVW)Fixed point bracket • Fixing the run to the building• For wall mounting• For ceiling mountingDependent upon local conditionsand planning1)Fixed point brackets are not required due to the type of system.2)These are recommendations for planning. Please refer to the technical data tables for max. permissible fixing distances.<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong><strong>Planning</strong> Manual, 10/2007, A5E01541101-01 259

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!