Glossary<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong>274 <strong>Planning</strong> Manual, 10/2007, A5E01541101-01
IndexAAdditional equipment, 59, 126, 167, 222Advance planning, 28Anti-rotation feature, 121Approval documentation, 19Areas at risk of fire, 239Areas of application, 15, 33AS-i, 13Assembly components, 162BBD01 system, 12, 17Bus line, 20Bus systems, 13CCable, 26Cable cluster, 26Cable compartment, 44, 122, 123Cable loads, 26Cable trunking, 26Cast resin LRC, 14CD-K system, 12, 15Certificates, 36, 105, 149, 209Clean earth, 32Clean room technology, 15Conditional short circuit rating Icc, 31, 166Conductor configurations, 40, 107, 154, 213Conductor cross sectionsFor feeder units and incoming supplies, 67, 136,199For tap-off units, 69, 200Conductor material, 36, 104, 149, 209Connection method, 16, 18, 36, 104, 149, 209Connection units for transformers and distributionboards, 118, 160, 218Consideration of busbar layout, 28Contact mechanism, 121, 162Coupling units, 48, 120Creation of a specification, 29, 36, 104, 148, 208Current carrying capacity, 26, 153, 212Cut-outs, 250DDeclarations of conformity, 36, 105, 149, 209Degrees of protection, 239Degrees of protection for busbar trunking systems, 239Degrees of protection for electrical equipmentOverview, 239Demand factor, 243Department stores, 15Derating, 32, 37, 57, 105, 153, 212Determining the rated current, 244Determining the voltage drop, 233Dimensioning, 233Dimensioning software, 14, 269Distribution board feeder, 47Distribution board link, 116, 158, 217Distribution systems (network structures), 241Draft planning, 28EEarly-make PE/PEN, 121EIB, 13Electromagnetic interference, 26, 262Electronic loads subject to harmonics, 33End cap, 126, 167Expansion compensation, 36, 104, 112, 148, 208FFeeder units, 44, 47, 116, 158, 217Fire load, 63, 64, 65, 66, 128, 129, 130, 131, 132, 133,134, 135, 198, 225, 226, 227, 228, 229, 230Fire protection, 19, 245Fire resistance class, 249Fireproof barrier, 248Fixing bracketfor horizontal mounting, 258for vertical mounting, 256Fixing distances, max., 31, 63, 128, 198, 225Flexible movable trunking units, 44<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong><strong>Planning</strong> Manual, 10/2007, A5E01541101-01 275
- Page 1:
Planning Manual · 10/2007Planning
- Page 4 and 5:
Safety GuidelinesThis manual contai
- Page 6 and 7:
Table of contents3.3 Technical data
- Page 8 and 9:
Table of contents6 Planning with LR
- Page 10 and 11:
Table of contentsPlanning with SIVA
- Page 12 and 13:
System overview1.1 Overview of Siem
- Page 14 and 15:
System overview1.1 Overview of Siem
- Page 16 and 17:
System overview1.2 CD-K systemConne
- Page 18 and 19:
System overview1.3 BD01 systemConne
- Page 20 and 21:
System overview1.4 Networked busbar
- Page 22 and 23:
Planning principles2.2 Busbar trunk
- Page 24 and 25:
Planning principles2.2 Busbar trunk
- Page 26 and 27:
Planning principles2.2 Busbar trunk
- Page 28 and 29:
Planning principles2.2 Busbar trunk
- Page 30 and 31:
Planning principles2.3 Rated curren
- Page 32 and 33:
Planning principles2.4 System selec
- Page 34 and 35:
Planning principles2.4 System selec
- Page 36 and 37:
Planning with BD2A/BD2C3.2 System c
- Page 38 and 39:
Planning with BD2A/BD2C3.2 System c
- Page 40 and 41:
Planning with BD2A/BD2C3.2 System c
- Page 42 and 43:
Planning with BD2A/BD2C3.2 System c
- Page 44 and 45:
Planning with BD2A/BD2C3.2 System c
- Page 46 and 47:
Planning with BD2A/BD2C3.2 System c
- Page 50 and 51:
Planning with BD2A/BD2C3.2 System c
- Page 52 and 53:
Planning with BD2A/BD2C3.2 System c
- Page 54 and 55:
Planning with BD2A/BD2C3.2 System c
- Page 56 and 57:
Planning with BD2A/BD2C3.2 System c
- Page 58 and 59:
Planning with BD2A/BD2C3.2 System c
- Page 60 and 61:
Planning with BD2A/BD2C3.2 System c
- Page 62:
Planning with BD2A/BD2C3.3 Technica
- Page 65 and 66:
Planning with BD2A/BD2C3.3 Technica
- Page 67 and 68:
Planning with BD2A/BD2C3.4 Conducto
- Page 69 and 70:
Planning with BD2A/BD2C3.4 Conducto
- Page 71 and 72:
Planning with BD2A/BD2C3.5 Dimensio
- Page 73 and 74:
Planning with BD2A/BD2C3.5 Dimensio
- Page 75 and 76:
Planning with BD2A/BD2C3.5 Dimensio
- Page 77 and 78:
Planning with BD2A/BD2C3.5 Dimensio
- Page 79 and 80:
Planning with BD2A/BD2C3.5 Dimensio
- Page 81 and 82:
Planning with BD2A/BD2C3.5 Dimensio
- Page 83 and 84:
Planning with BD2A/BD2C3.5 Dimensio
- Page 85 and 86:
Planning with BD2A/BD2C3.5 Dimensio
- Page 87 and 88:
Planning with BD2A/BD2C3.5 Dimensio
- Page 89 and 90:
Planning with BD2A/BD2C3.5 Dimensio
- Page 91 and 92:
Planning with BD2A/BD2C3.5 Dimensio
- Page 93 and 94:
Planning with BD2A/BD2C3.5 Dimensio
- Page 95 and 96:
Planning with BD2A/BD2C3.5 Dimensio
- Page 97 and 98:
Planning with BD2A/BD2C3.5 Dimensio
- Page 99 and 100:
Planning with BD2A/BD2C3.5 Dimensio
- Page 101 and 102:
Planning with BD2A/BD2C3.5 Dimensio
- Page 103 and 104:
Planning with LDA/LDC 44.1 System d
- Page 105 and 106:
Planning with LDA/LDC4.2 System com
- Page 107 and 108:
Planning with LDA/LDC4.2 System com
- Page 109 and 110:
Planning with LDA/LDC4.2 System com
- Page 111 and 112:
Planning with LDA/LDC4.2 System com
- Page 113 and 114:
Planning with LDA/LDC4.2 System com
- Page 115 and 116:
Planning with LDA/LDC4.2 System com
- Page 117 and 118:
Planning with LDA/LDC4.2 System com
- Page 119 and 120:
Planning with LDA/LDC4.2 System com
- Page 121 and 122:
Planning with LDA/LDC4.2 System com
- Page 123 and 124:
Planning with LDA/LDC4.2 System com
- Page 125 and 126:
Planning with LDA/LDC4.2 System com
- Page 127 and 128:
Planning with LDA/LDC4.3 Technical
- Page 129 and 130:
Planning with LDA/LDC4.3 Technical
- Page 131 and 132:
Planning with LDA/LDC4.3 Technical
- Page 133 and 134:
Planning with LDA/LDC4.3 Technical
- Page 135 and 136:
Planning with LDA/LDC4.3 Technical
- Page 137 and 138:
Planning with LDA/LDC4.3 Technical
- Page 139 and 140:
Planning with LDA/LDC4.3 Technical
- Page 141 and 142:
Planning with LDA/LDC4.5 Dimension
- Page 143 and 144:
Planning with LDA/LDC4.5 Dimension
- Page 145 and 146:
Planning with LDA/LDC4.5 Dimension
- Page 147 and 148:
Planning with LXA/LXC 55.1 System d
- Page 149 and 150:
Planning with LXA/LXC5.2 System com
- Page 151 and 152:
Planning with LXA/LXC5.2 System com
- Page 153 and 154:
Planning with LXA/LXC5.2 System com
- Page 155 and 156:
Planning with LXA/LXC5.2 System com
- Page 157 and 158:
Planning with LXA/LXC5.2 System com
- Page 159 and 160:
Planning with LXA/LXC5.2 System com
- Page 161 and 162:
Planning with LXA/LXC5.2 System com
- Page 163 and 164:
Planning with LXA/LXC5.2 System com
- Page 165 and 166:
Planning with LXA/LXC5.2 System com
- Page 167 and 168:
Planning with LXA/LXC5.2 System com
- Page 169 and 170:
Planning with LXA/LXC5.3 Technical
- Page 171 and 172:
Planning with LXA/LXC5.3 Technical
- Page 173 and 174:
Planning with LXA/LXC5.3 Technical
- Page 175 and 176:
Planning with LXA/LXC5.3 Technical
- Page 177 and 178:
Planning with LXA/LXC5.3 Technical
- Page 179 and 180:
Planning with LXA/LXC5.3 Technical
- Page 181 and 182:
Planning with LXA/LXC5.3 Technical
- Page 183 and 184:
Planning with LXA/LXC5.3 Technical
- Page 185 and 186:
Planning with LXA/LXC5.3 Technical
- Page 187 and 188:
Planning with LXA/LXC5.3 Technical
- Page 189 and 190:
Planning with LXA/LXC5.3 Technical
- Page 191 and 192:
Planning with LXA/LXC5.3 Technical
- Page 193 and 194:
Planning with LXA/LXC5.3 Technical
- Page 195 and 196:
Planning with LXA/LXC5.3 Technical
- Page 197 and 198:
Planning with LXA/LXC5.3 Technical
- Page 199 and 200:
Planning with LXA/LXC5.3 Technical
- Page 201 and 202:
Planning with LXA/LXC5.4 Dimension
- Page 203 and 204:
Planning with LXA/LXC5.4 Dimension
- Page 205 and 206:
Planning with LXA/LXC5.4 Dimension
- Page 207 and 208:
Planning with LRC 66.1 System descr
- Page 209 and 210:
Planning with LRC6.2 System compone
- Page 211 and 212:
Planning with LRC6.2 System compone
- Page 213 and 214:
Planning with LRC6.2 System compone
- Page 215 and 216:
Planning with LRC6.2 System compone
- Page 217 and 218:
Planning with LRC6.2 System compone
- Page 219 and 220:
Planning with LRC6.2 System compone
- Page 221 and 222:
Planning with LRC6.2 System compone
- Page 223 and 224: Planning with LRC6.2 System compone
- Page 225 and 226: Planning with LRC6.3 Technical data
- Page 227 and 228: Planning with LRC6.3 Technical data
- Page 229 and 230: Planning with LRC6.3 Technical data
- Page 231 and 232: Planning with LRC6.4 Dimension draw
- Page 233 and 234: Further information about planning
- Page 235 and 236: Further information about planning7
- Page 237 and 238: Further information about planning7
- Page 239 and 240: Further information about planning7
- Page 241 and 242: Further information about planning7
- Page 243 and 244: Further information about planning7
- Page 245 and 246: Further information about planning7
- Page 247 and 248: Further information about planning7
- Page 249 and 250: Further information about planning7
- Page 251 and 252: Further information about planning7
- Page 253 and 254: Further information about planning7
- Page 255 and 256: Further information about planning7
- Page 257 and 258: Further information about planning7
- Page 259 and 260: Further information about planning7
- Page 261 and 262: Further information about planning7
- Page 263 and 264: Further information about planning7
- Page 265 and 266: Further information about planning7
- Page 267 and 268: Further information about planning7
- Page 269 and 270: Further information about planning7
- Page 271 and 272: GlossaryAThe manufacturers of low-v
- Page 273: GlossaryRated ultimate short-circui
- Page 277 and 278: IndexSelection of systems, 31Select
- Page 280: Siemens AGAutomation and DrivesLow-