10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Further information about planning7.4 Fireproof barrierSystem a [cm] b [cm]LXA06../LXC06.. 35 49LXA07../LXC07.. 35 49LXA08../LXC08.. 35 64LXA09../LXC09.., LXA10.. 35 80LRC01.. - LRC03.. 19 19LRC04.. 22 22LRC05.., LRC06.. 22 25LRC07.. 22 29LRC08.. 22 32LRC09.. 22 34LRC27.. 22 48LRC28.. 22 54LRC29.. 22 58NoteThe area between the busbar wall and the wall cut-out must be filled <strong>with</strong> mortar or fireproofmaterial; these must meet applicable requirements <strong>with</strong> regard to the achievement of fireresistance class S90/S120.NoteMinimum clearanceFor the installation of <strong>SIVACON</strong> 8<strong>PS</strong> busbar systems <strong>with</strong> fire protection, a minimumclearance of 5 cm must be maintained between the system/system fire protection and thestructure in the cut-out. This ensures that there is sufficient space to mount the run, the fixingbrackets and for filling <strong>with</strong> mortar.<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong><strong>Planning</strong> Manual, 10/2007, A5E01541101-01 251

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!