10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Further information about planning7.4 Fireproof barrier7.4 Fireproof barrierGerman building regulations require that buildings are constructed in such a way as to"prevent the development and spread of fire and fumes and make possible the rescue ofpersons and animals as well as fire fighting". Accordingly, neither fire nor fumes arepermitted to spread from one floor or fire area to another.BD01 (for S90), BD2A/BD2C, LDA/LDC, LXA/LXC and LRC (for S120) busbar systems canbe fitted <strong>with</strong> a fireproof barrier, thereby achieving general compliance <strong>with</strong> regulationsgoverning buildings (including high rise buildings).The required conditions for a busbar trunking system compliant <strong>with</strong> DIN 4102 are illustratedin the diagram.The systems meet the requirements to prove fire resistance periods as per the fireresistance class specifications in ISO 834-1 in accordance <strong>with</strong> IEC/EN 60439-2.Figure 7-8 Conditions for busbar trunking systems compliant <strong>with</strong> DIN 41021 Permissible temperature increase on components max. 180°C2 Area on fire: Fire in accordance <strong>with</strong> standard temperature curve DIN 4102, Sheet 23 Permissible temperature increase of escaping air max. 140°C4 No flammable gases must be allowed to escape. No fumes likely to impair rescue attemptsmust be allowed to escape.<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong>248 <strong>Planning</strong> Manual, 10/2007, A5E01541101-01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!