10.07.2015 Views

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

Planning with SIVACON 8 PS - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Further information about planning7.1 Dimensioning and selection7.1.6 Distribution systems (grid types) in accordance <strong>with</strong> IEC 60364-1Determining the protective measure and selecting the electrical equipment appropriate for yourdistribution systemTN systemsTN-S system: The neutral conductor and protective conductor function are separatethroughout the system.Figure 7-1TN-S systemTN-C system: The neutral conductor and protective conductor function are combinedthroughout the system.Figure 7-2TN-C systemTN-C-S system: Hybrid neutral conductor and protective conductor function. In one part ofthe system they are combined, in the other part they are separate.Figure 7-3TN-C-S system<strong>Planning</strong> <strong>with</strong> <strong>SIVACON</strong> 8 <strong>PS</strong><strong>Planning</strong> Manual, 10/2007, A5E01541101-01 241

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!