Connecting the AC Grid to the Inverter<br />

Connecting the AC Grid to the Inverter<br />

Use a five-wire cable for this connection. The maximum wire size for the input terminal<br />

blocks is 16mm².<br />

To connect the AC grid to the inverter via the DC Safety Unit:<br />

1. Turn OFF the following:<br />

• The inverter ON/OFF switch<br />

• The AC circuit breaker<br />

• The DC Safety Switch Unit<br />

2. Open the inverter cover: Release the Allen screws and carefully move the cover<br />

horizontally before lowering it.<br />

CAUTION!<br />

When removing the cover, make sure not to damage internal components. <strong>SolarEdge</strong><br />

will not be held responsible for any components damaged as a result of incautious cover<br />

removal.<br />

3. Loosen the screws on the front cover of the DC Safety Unit, as shown below:<br />

4. Remove the DC Safety Unit cover.<br />

Figure 38: Opening the DC Safety Unit cover<br />

5. Strip 35 cm of the external cable insulation and strip 8 mm of the internal wire<br />

insulation.<br />

Figure 39: Insulation stripping – AC<br />

6. Open the AC cable gland and insert the cable through the gland (see Figure 37).<br />

7. Connect the grounding wire to the equipment grounding terminal in the DC Safety Unit.<br />

NOTE<br />

Connect the equipment grounding before connecting the AC wires to the AC terminal<br />

block.<br />

104<br />

<strong>SolarEdge</strong>-Installation Guide MAN-01-00057-3.1