Chapter 4: Connecting the AC and the Strings to the Inverter<br />

Three Phase Inverter<br />

Wire type<br />

Connect to<br />

terminal<br />

Line 1 L1<br />

Line 2 L2<br />

Line 3<br />

Protective Earth<br />

Neutral<br />

L3 (feeds the internal<br />

power supply)<br />

PE<br />

N<br />

Figure 14: Three Phase Inverter AC<br />

Terminals<br />

NOTE<br />

If power control is enabled, it is important to respect the order of grid lines connection to<br />

the inverter. A 120deg phase difference should be kept between L1 to L2 and between<br />

L2 to L3 (L1-L2-L3 and not, for example L1-L3-L2).<br />

If the grid lines are not in this order, an error is displayed on the LCD and the inverter will<br />

not produce power.<br />

6. Tighten the screws of each terminal with a torque of 1.2-1.5 N*m / 0.88-1.1 lb*ft.<br />

7. Check that the wires are fully inserted and cannot be pulled out easily.<br />

8. Tighten the AC cable gland with a torque of 2.8-3.3 N*m / 2.0-2.4 lb*ft.<br />

9. Verify that there are no unconnected wires to the inverter and that the unused terminal<br />

screws are tightened.<br />

Connecting the Strings to the Inverter<br />

Connect the string to the DC input pairs. If required, connect additional strings in parallel using<br />

an external combiner box/branch cables before connecting to the inverter.<br />

NOTE<br />

Functional electrical earthing of DC-side negative or positive poles is prohibited because<br />

the inverter has no transformer. Grounding (earth ground) of module frames and<br />

mounting equipment of the PV array modules is acceptable.<br />

NOTE<br />

<strong>SolarEdge</strong>’s fixed input voltage architecture enables the parallel strings to be of different<br />

lengths. Therefore, they do not need to have the same number of power optimizers, as<br />

long as the length of each string is within the permitted range.<br />