AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Involvement of other partners and<br />

external funding<br />

4<br />

Assessment:<br />

The project involved some external partners covering some of the main technical /commercial /<br />

stakeholder aspects as applicable.<br />

Evidence:<br />

The summary of the LCNF funds learning EATL report does not highlight any partners. However, the LCH;<br />

Full Submission Pro-forma does note some external collaborators and partners:<br />

• A FACTs provider who will supply, implement, commission, operate and maintain the FACTs<br />

device and network filters.<br />

• Distributed generators<br />

• Local authority<br />

• Fundamentals Ltd, who is a technical partner.<br />

From the closedown report:<br />

• A S&C 3.75 MVAr PureWave DStatcom device was supplied and used in the project. Exact details<br />

of the provider who installed and will maintain are not clear in the closedown report.<br />

• Fundamentals Ltd supported the development of the DVC method due to their detailed knowledge<br />

of Voltage Control relays. They created the DVC algorithm for both hardwired and DNP3 control.<br />

• Connections were offered to 34 DG and accepted by 5.<br />

• May be limited involvement of the LA, but was a workshop to over 90 local authority planners.<br />

Overall, it appears that there are two main technical partners covering equipment provision and part of the<br />

project design.<br />

From the full submission pro-forma, it appears that £30,000 of external funding was received from the<br />

FACTs provider.<br />

References:<br />

• Low Carbon Hub project closedown report, 27th May 2015.<br />

• Summary of the LCNF funds learning EATL, April 2016.<br />

• LCH; Full Submission Pro-forma.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

192

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!