01.12.2016 Views

EVALUATION

evaluation_of_the_lcnf_0

evaluation_of_the_lcnf_0

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Focuses on network methods that are<br />

at the trialling stage<br />

5<br />

Assessment:<br />

Solution moved to TRL9 (actual system proven in operational environment), or commercial solution<br />

proven in operational environment.<br />

Evidence:<br />

TRL in the pro-forma is marked as between 6 and 8. All objectives and success criteria for the project<br />

were met, as detailed in section 9 of the closedown report. A system is in place across the Isles. The<br />

learning from the project is also being used in FALCON. The solution is therefore considered to be at<br />

TRL9.<br />

References:<br />

• Network Management on the Isles of Scilly; Close down report; November 2013.<br />

• Tier 1 pro-forma<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

268

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!