AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Thus, despite the challenges of managing innovation projects with their inherent<br />

uncertainty, the large Tier 2 projects have generally been well managed against<br />

their Successful Delivery Reward Criteria (SDRC).<br />

8. SoLa Bristol, which considered a combination of energy storage in customer's<br />

premises, together with variable tariffs and integrated network control, was allocated<br />

a low score in our evaluation for ‘project relevance and timing’.<br />

The project concluded that small-scale storage does not offer DNOs an immediate<br />

or medium-term opportunity to modify the distribution system to integrate PV and<br />

batteries. This should be reviewed once the storage market, where high costs have<br />

kept the market small, has matured. However it was noted that whilst the benefits<br />

are small for DNOs (when compared to implementation costs) there may be a<br />

business case for implementation by housebuilders, energy suppliers or Building<br />

Management companies.<br />

4.2 Individual project assessment - Tier 1 projects<br />

The Tier 1 projects are the smaller projects for which the DNOs were allowed to recover a<br />

proportion of the project cost. The Tier 1 projects are required to trial a new piece of<br />

equipment, arrangement or practice and to also meet the criteria in the LCNF governance<br />

document.<br />

4.2.1 Numbers of projects<br />

A total of 42 Tier 1 projects have been funded over the five-year period of the LCNF. One<br />

project was stopped when it was clear there was not a positive cost-benefit case. Other<br />

projects are ongoing.<br />

4.2.2 Individual project evaluation<br />

As part of this evaluation all of the completed Tier 1 projects have been individually<br />

assessed against a set of criteria – drawn from the initial LCNF assessment criteria with<br />

the exception of the criteria to avoid duplication which is discussed below. The results of<br />

the assessments are provided in Table 8. More detail, in the form of the supporting<br />

evaluations, together with further information on the evaluation method used and scoring<br />

criteria, is provided in Annex E of this report.<br />

There are also a number of ongoing projects that have not been evaluated – these are<br />

identified in Table 6.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

40