AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Relevance and timing 4<br />

Effective project methodology, and<br />

effectiveness of implementation<br />

4<br />

Impact Research<br />

Customer engagement and analysis<br />

C2C Full Submission Proforma Second Tier funding request:<br />

• LCN Fund: £9.109 million<br />

• Electricity North West Contribution: £1.028 million<br />

• Project Partners' contribution: £0.489million<br />

References:<br />

C2CClose down report<br />

Original Low Carbon Networks Fund submission form ENWL – C2C<br />

C2C website<br />

Assessment:<br />

The project has been /is ready to roll out into BAU.<br />

The project has a high likelihood of being replicated by other DNOs.<br />

Evidence:<br />

The C2C Method is part of a suite of strategic interventions to defer or avoid network reinforcement<br />

issues. Networks are analysed on an individual basis, as generalisation of benefits is not accurate and<br />

very much specific to the combination of network composition, topology and demand locations. Company<br />

planning policy is being updated to reflect the requirements of the C2C Solution. The C2C commercial<br />

offering has become the standard solution for all DG new connections and principles are being moved<br />

into demand connections.<br />

References:<br />

C2CClose down report & ENWL response to evaluation questions<br />

Assessment:<br />

The project achieved all its successful delivery reward criteria (SDRC) and there was no overspend<br />

>10%,however the variance was >10%<br />

Evidence:<br />

Total project variance 16% (underspend) due to project efficiencies<br />

All SDRC’s were met during the project but an extension to the project timescale was required during the<br />

project to enable ten new customer contracts to be signed and full learning to be gained.<br />

References:<br />

C2CClose down report<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />