AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Asset rating SPEN –<br />

Implementation of<br />

Real-Time Ratings<br />

Plans for this technology over the next 15 years<br />

originally depended on the connection requests<br />

for wind farms via new or existing overhead line<br />

networks. However, due to Government policy<br />

changes, the number of connection requests for<br />

onshore wind has been significantly reduced<br />

compared to the time when the project was<br />

conceived. The prime driver for Dynamic Line<br />

Rating (DLR) is now the alleviation of<br />

operational constraints on ≥132kV OHL<br />

networks. DLR technology is being considered<br />

for a 132kV interconnection between Barlaston<br />

and Crewe. SPEN anticipates that by the end<br />

of ED1/T1 they may have 1-2 circuits utilising a<br />

DLR solution, with the expectation of several<br />

others to follow in ED2/T2.<br />

Fault Level<br />

Management<br />

Network<br />

Configuration<br />

ENWL – Fault<br />

current active<br />

management<br />

SSEPN – Digital<br />

substation platform<br />

SPEN – Clyde<br />

Gateway<br />

ENWL – The<br />

Bidoyng Smart Fuse<br />

The learning from the trial of the innovative use<br />

of existing protection assets as an alternative to<br />

traditional methods and the use of existing and<br />

new assets for fault current management is<br />

being used in the RESPOND T2 project.<br />

The project helped progress and inform the<br />

future IT architecture required for substation<br />

protection, control and monitoring. The learning<br />

from this project has been used to inform<br />

discussion between SSEPD and NGETSO on<br />

the future ANM interface at GSPs and has<br />

assisted with a proposal for an NIA project.<br />

Over the course of ED1 and ED2 SPEN expects<br />

LV automation to become cost effective, expand<br />

in coverage and types of benefits. By the end of<br />

ED2 they expect each DNO to possess<br />

thousands of LV automation units.<br />

ENWL has deployed 646 Bidoyngs on the<br />

network (summer 2016)<br />

NPG LV automation - restore supplies to a<br />

significant number of customers following a<br />

transient fault.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!