AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Large scale<br />

storage<br />

Network<br />

configuration<br />

Large battery demonstration<br />

Interconnected actively<br />

managed networks<br />

Determination of storage ability to solve network<br />

constraints and support balancing and stability of<br />

transmission system<br />

3 1<br />

Maximise the utilisation of network capacity 6 4<br />

Small scale<br />

storage<br />

LV battery demonstration<br />

Determination of storage ability to mitigate distribution<br />

network constraints<br />

3 1<br />

Visibility<br />

Voltage Control<br />

Enhanced monitoring, as an<br />

enabler to other solutions,<br />

demand profiling<br />

Primary and secondary network<br />

voltage control<br />

Provision of data and information about assets to allow<br />

action to be taken – probably in conjunction with another<br />

innovative initiative<br />

Demonstration of innovative voltage management<br />

techniques to allow connection of generation and<br />

demand without asset reinforcement<br />

17 18<br />

10 4<br />

TOTAL 78 43<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

53