AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Focuses on network methods that are<br />

at the trialling stage<br />

2<br />

Assessment:<br />

Solution moved to TRL6 (technology demonstrated in relevant environment), or commercial solution<br />

demonstrated in restricted environment<br />

Evidence:<br />

TRL 6 in the first tier project pro-forma. The closedown report states that initial figure was difficult to<br />

determine and that the justification discussed in the report puts the TRL at 6 upon completion of this Tier<br />

1 project.<br />

References:<br />

• Tier 1 project pro-forma.<br />

• Low Voltage (LV) Network Modelling and Analysis Environment; Closedown report; February<br />

2013.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />