AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Interconnection of WPD and NGC SCADA<br />

Project Title<br />

Interconnection of WPD and NGC SCADA<br />

Tier 1<br />

DNO<br />

WPD<br />

Status<br />

Complete<br />

LCNF project funding £79,000<br />

Project objectives This objective of this project was to establish a real time link between the SCADA systems operated by National Grid and<br />

Western Power Distribution such that data on either system can be viewed on the other in real time. The objectives were to:<br />

• Establish the link<br />

• Establish access to the data and methods of viewing the data<br />

• Establish the security measures required to ensure the security of the link to both of the systems against cyber-attack.<br />

Assessment<br />

Criteria<br />

Accelerates the development of a low<br />

carbon energy sector<br />

Score<br />

(1-5)<br />

4<br />

Overview of assessment, sources of evidence and comments<br />

Assessment:<br />

The project clearly facilitates the connection of low carbon generation or demand.<br />

The carbon benefits not specifically quantified.<br />

Evidence:<br />

DNOs have real time visibility of EHV and significant HV connected distributed generation but NGC do<br />

not. As the amount of DG increases it will become important for NGC to have real time visibility of their<br />

operation to enable them to undertake system balancing and manage power flow.<br />

With further research, an increased benefit to NGC could be delivered in terms of visibility of the end to<br />

end electricity system and deliver reduced system risk to the UK as a whole. However, carbon benefits of<br />

the project are not clearly defined or quantified.<br />

References:<br />

• Interconnection of WPD and NGC SCADA Systems; Closedown report; March 2013.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

342

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!