AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Has a Direct Impact on the operation<br />

of a DNO’s Distribution System<br />

Generates knowledge that can be<br />

shared amongst all DNOs<br />

4<br />

5<br />

Assessment:<br />

The project has been /is ready to roll out into BAU or outputs are utilised in later LNCF projects.<br />

The project has a high likelihood of being replicated by other DNOs.<br />

Evidence:<br />

Electricity North West plan to carry out a detailed review of the LV planning codes of practice following all<br />

of the projects that are being undertaken. This should result in more comprehensive guidance with a<br />

wider portfolio of solutions to cater for different network conditions which can be used as part of business<br />

as usual. The project solution is not yet implemented as BAU. However, outputs from the project are<br />

being used in the follow-on Tier 2 project ‘Smart Street’.<br />

The smart joint developed in the project is a BAU technique for establishing means of voltage<br />

measurement on LV feeders at a point remote from a feeding substation. To-date 200 smart joints have<br />

been deployed.<br />

References:<br />

• Low Voltage Integrated Automation; Close down report; December 2013.<br />

Assessment:<br />

Specific replication report(s) exist / are available on request.<br />

A learning dissemination event or webinar was held.<br />

Evidence:<br />

As a direct outcome of this project Electricity North West has produced and made publicly available:<br />

• The algorithm used to adjust the set point<br />

• Communications architecture for the LoVIA system<br />

This technical information is contained in the closedown report and in the appendices and is available for<br />

download via the Electricity North West website.<br />

Electricity North West has presented this project at two LCNF annual conferences.<br />

References:<br />

• Low Voltage Integrated Automation; Close down report; December 2013.<br />

• http://www.enwl.co.uk/about-us/the-future/nia-lcnf-tier-1/lovia<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

345

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!