AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Has the potential to deliver net<br />

financial benefits to future and/or<br />

existing customers<br />

Generates knowledge that can be<br />

shared amongst all DNOs<br />

-<br />

-<br />

Assessment:<br />

The project is likely to deliver significant financial benefits in the long term (ED2 and beyond) to a<br />

selected group of customers<br />

Evidence summary:<br />

The business case is case study specific and is based on the improved speed of connection and reduced<br />

network reinforcement cost. As the project has not completed this is not yet known, however the<br />

publically available information identifies that the project has allowed a range of type and sizes of<br />

generation to connect using a variety of ANM solutions.<br />

The duration of the benefits depends on the business case of the generator and the specificities of the<br />

network to which it is connecting – in some instances if the constraints are significant it may be that the<br />

network is upgraded at some point in the future with a resultant firm, non managed connection and hence<br />

just an accelerated connection is achieved. In some cases the solution may be permanent.<br />

References:<br />

• LCNF Full Submission Pro-Forma<br />

• December 2014, 6 monthly project progress report<br />

• http://www.arc-project.com/green-energy-award/<br />

• Presentation 1 – Euan Norris ARC workshop 17_03_2016<br />

Assessment:<br />

Project incomplete not marked<br />

Workshop held:<br />

• Accelerating Renewable Connections, Commercial Mechanisms & Constraints Analysis<br />

Workshop 17/3/16<br />

Project is using WPD LV network template techniques.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />

198

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!