AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Focuses on network methods that are<br />

at the trialling stage<br />

3<br />

Assessment:<br />

Parts of the solution moved to TRL8 (complete and qualified by end of trial), or commercial solution<br />

developed suitable for roll out. Parts of solution remain at TRL 5.<br />

Evidence:<br />

The tier 1 pro-forma indicated that, at the start of the project, the project elements ranged from TRL 5 to<br />

TRL 8. However, the project closedown report shows all elements of the project at TRL5 at the start of the<br />

project. At the end of the project two elements had been moved to TRL 8, while four others remained at<br />

TRL 5.<br />

References:<br />

• Clyde Gateway LR1 (London Road 1); Close down report; April 2014.<br />

• Tier 1 pro-forma.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />