AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Has the potential to deliver net<br />

financial benefits to future and/or<br />

existing customers<br />

Generates knowledge that can be<br />

shared amongst all DNOs<br />

-<br />

5<br />

Assessment:<br />

Evidence that the project is highly likely to deliver significant financial benefits in the long term (ED2 and<br />

beyond) to the majority of customers.<br />

Evidence:<br />

The closedown report highlights a reduction in customer energy bills from the South Wales selective voltage<br />

reduction deployment.<br />

References:<br />

• LV Network Templates; Project closedown report.<br />

• Summary of the LCNF funds learning EATL, April 2016.<br />

Assessment:<br />

Specific replication report(s) exist.<br />

These cover the main technical / commercial / stakeholder aspects as applicable.<br />

A learning dissemination event or webinar was held.<br />

Evidence:<br />

The project replication section of the closedown report gives a good level of detail relating to physical<br />

components or knowledge requirements; Appendix A of the closedown report considers knowledge<br />

management which is complementary to the project’s various engineering reports which allow the LV<br />

Templates process to be understood and replicated. Network templates data is published in Appendix C of<br />

the closedown report. An email is provided for obtaining further information and the lv network templates<br />

classification tool is provided on request.<br />

A large number of dissemination methods and events were use/held including websites, press releases.<br />

Industry conferences and seminars, industry reports, a public engagement company, workshops and direct<br />

DNO engagement (particularly at the final stages of the project).<br />

Techniques from the project are being used by SPEN ARC.<br />

References:<br />

• LV Network Templates; Project closedown report., main document, Appendix A and Appendix C<br />

• Stresses on the LV network from low carbon installations<br />

• Use of proxy PV FiT meters to reflect local area Generation<br />

• Demonstration of LV Network Templates through statistical analysis<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />