AN INDEPENDENT <strong>EVALUATION</strong> OF THE LCNF<br />

Focuses on network methods that<br />

are at the trialling stage<br />

3<br />

Assessment:4<br />

Solution moved to TRL7 (system prototype demonstrated in operational environment), or commercial<br />

solution demonstrated in operational environment.<br />

Evidence:<br />

TRL is not specifically mentioned in the closedown report. Considered that technology is at least at TRL 7<br />

(technology validated in relevant environment). Commercial arrangements are being looked at as part of<br />

the Tier 2 Smarter Network Storage project.<br />

References:<br />

• First tier project registration pro-forma<br />

• Demonstrating the benefits of short-term discharge energy storage on an 11kV distribution<br />

network; Close down report; June 2014.<br />

PÖYRY MANAGEMENT CONSULTING<br />

October 2016<br />

713_Poyry_Report_Evaluation_of_the_LCNF_FINAL_Oct_2016_v700.docx<br />