Concrete is fed in<br />

through the pipe at<br />

the back of the rig,<br />

through the pipe and<br />

down the centre of the<br />

hollow stem of the<br />

auger<br />

The CFA penetrates through<br />

the ground until it reaches the<br />

required depth<br />

The CFA penetrates through<br />

the ground arisings are<br />

brought to the surface. The<br />

strata brought to the surface<br />

can be inspected and then<br />

removed<br />

As the auger is removed,<br />

concrete is pumped, under<br />

pressure, down the central pipe<br />

Once the auger is fully removed<br />

the reinforcement cage can be<br />

pushed into the concrete bore<br />

Figure 3.51 CFA piles.<br />

Continuous flight auger<br />

Arisings<br />

brought to the<br />

surface<br />

Photograph 3.8 CFA (http://www.roger-bullivant.co.uk).