Structural Steel Frames 335<br />

50 or<br />

75 mm<br />

175<br />

mm<br />

2390 mm<br />

1200 mm<br />

Lengths up to 24.0 m<br />

300–800 mm in<br />

100 mm increments<br />

Prestressed concrete double T-beam<br />

Minimum 50 mm thick<br />

reinforced concrete<br />

topping<br />

Mesh<br />

Reinforced<br />

concrete<br />

column<br />

Minimum 50 mm thick<br />

reinforced concrete<br />

topping<br />

Mesh<br />

reinforcement<br />

Steel<br />

column<br />

Ends of T-beams<br />

bear on toe of boot<br />

section<br />

Double<br />

T-beam<br />

Double T-beam bearing on concrete beam<br />

Ends of T-beams<br />

fixed to steel beam<br />

with angle cleats<br />

Double<br />

T-beam<br />

Double T-beam bearing on steel beam<br />

Figure 5.58 Prestressed concrete double T-beam.<br />

Cold-rolled steel deck and concrete floor<br />

The traditional concrete floor to a structural steel frame consisted of reinforced concrete,<br />

cast in situ with the concrete casing to beams, cast on timber centring and falsework<br />

supported at each floor level until the concrete had sufficient strength to be self-supporting.<br />

The very considerable material and labour costs in erecting and striking the support for the<br />

concrete floor led to the adoption of the precast concrete self-centring systems such as<br />

the hollow beam and plank, and beam and infill block floors. The term ‘self-centring’<br />

derives from the word ‘centring’ used to describe the temporary platform of wood or steel<br />

on which in situ cast concrete is formed. The precast concrete beam, plank and beam, and<br />

block floors do not require temporary support, hence the term self-centring. A disadvantage<br />

of the precast concrete beam and plank floors for use with a structural steel frame is<br />

that it is usual practice to erect the steel frame in one operation. Raising the heavy, long<br />

precast concrete floor units and moving them into position is, to an extent, impeded by<br />

the skeleton steel frame.