386 Barry’s Advanced Construction of Buildings<br />

Post-tension cables and ducts<br />

are positioned within the<br />

reinforcement<br />

The tension cables are<br />

simply anchored into<br />

the concrete at one<br />

end and tension<br />

exerted at the other<br />

(a)<br />

Grouting tube,<br />

used once<br />

tension is exerted<br />

Reinforcement spacer<br />

chair<br />

Steel cables are left protruding<br />

at the access end<br />

Once the concrete is poured tension is exerted and a report is<br />

prepared on each tension cable reporting the level of force<br />

exerted<br />

(b)<br />

Photograph 6.8 (a and b) Post-tensioned concrete floor.