05.02.2017 Views

283757893275

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

56 Barry’s Advanced Construction of Buildings<br />

±<br />

Note: The thickness of the wall may<br />

vary and brackets will need to be<br />

designed and manufactured to suit<br />

,<br />

Figure 2.21 Façade tied to new frame (adapted from Highfield, 2002).<br />

structurally stable. Where cracking patterns suggest that de-lamination of the wall is occurring<br />

or the façade is losing its structural integrity, remedial works will be necessary. It is<br />

essential that monitoring and maintenance is continuous throughout the entire process and<br />

any operations necessary to ensure the façade and temporary works remain structurally<br />

sound are undertaken.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!