05.02.2017 Views

283757893275

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Scaffolding, Façade Retention and Demolition 31<br />

Head plate<br />

Tie braced to<br />

structural floor and<br />

ceiling<br />

Reveal pin (adjustable<br />

steel strut – must be<br />

secure)<br />

Sole plate<br />

Transom<br />

Ledger<br />

Protection to cill<br />

Transom helps improve<br />

lateral stability preventing<br />

the scaffold from moving<br />

inwards<br />

Figure 2.9 Scaffold through tie braced against floor and ceiling.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!