05.02.2017 Views

283757893275

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

250 Barry’s Advanced Construction of Buildings<br />

Cross ribs bonded to<br />

leaves in alternate courses<br />

Brick leaf<br />

Void<br />

Stretcher bond is<br />

broken by headers<br />

of cross ribs bonded<br />

in alternate courses<br />

Figure 4.86 Bonding of diaphragm wall.<br />

Lattice roof beam with slope to<br />

top boom to provide fall to<br />

roof<br />

Lattice beam bolted to the precast<br />

concrete capping beam<br />

Block cross wall – tied into brickwork<br />

Insulated internally to avoid cold bridges<br />

Traditionally, insulation would have been<br />

placed within the diaphragm wall;<br />

however, such practice will result in cold<br />

bridging across the ribs and capping beam<br />

Brick diaphragm<br />

wall<br />

Figure 4.87 Connection of roof beams to diaphragm wall.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!