477 [--] 3/4" stone<br />

Wm. A. Caire 475 ft. 3" pipe<br />

James A. DeGroat<br />

679 cu. yds. 5/8" gravel<br />

October 29, 1898<br />

Extra Payroll hauling [--] loads crushed stone<br />

November 3, 1898<br />

J. M. Cummings, Freight 24 cars crushed stone<br />

November 7, 1898<br />

Hudson River Stone Supply Co.<br />

301 cu. yds. 2" crushed stone<br />

327 1/2 cu. yds. 3/4" stone<br />

James A. DeGroat<br />

100 cu. yds. 5/8" gravel delivered in 50 yd. Lots<br />

Wm. A. Caire 400 ft. 6" tiles<br />

November 9, 1898<br />

J. Myers and Son<br />

Building 27 catch basins and laying tile from lower entrance to stable bridge on Creek Road<br />

and around semi-circle at lower entrance.<br />

L. Travis<br />

New Shaft, repair brake, road roller<br />

December 3, 1898<br />

Extra Payroll: Handling and hauling, dock to lower entrance<br />

311 cu. yds. Gravel (300 loads)<br />

December 5, 1898<br />

James A. DeGroat<br />

311 cu. yds. 5/8" gravel<br />

June 3, 1899<br />

Taxes on three cars stone<br />

June 10, 1899<br />

Taxes, Hudson River Stone Supply co.<br />

246 cu. yds 3/4" (9 cars)<br />

June 12, 1899<br />

Myers to maintain road, foundations, bridge<br />

September 26, 1899<br />

J. M. Myers: Repairs on glass house, Post Road Bridge, laying tile and manhole at river,<br />

repairing basin White Bridge, etc.<br />

September 27, 1899<br />

Myers: catch basins east side <strong>of</strong> Post Road south <strong>of</strong> bridge; . . . laying tile to farm house<br />

335