14.12.2012 Views

National Park Service U.S. Department of the Interior

National Park Service U.S. Department of the Interior

National Park Service U.S. Department of the Interior

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Comments<br />

Character-Defining Features <strong>of</strong> Individual Rooms<br />

1899-1906 1906 1940 Current<br />

Vanderbilt Renovation - Inventory Conditions<br />

First 1938<br />

Period<br />

X X X X<br />

Circulation and Spatial Arrangements<br />

Kitchen forms core <strong>of</strong> a cooking zone<br />

including Scullery, Dumbwaiter,<br />

Refrigerator, Kitchen Store Closet,<br />

<strong>Service</strong> Dining Room, <strong>Service</strong> Pantry,<br />

Cook's Room<br />

Kitchen at north delivery entry X X X X North window with view <strong>of</strong> entry<br />

Access to Hall, Scullery X X X X<br />

Furnishing and <strong>Interior</strong> Design Elements<br />

Built-in china dresser X X X X<br />

Center work table X X M M Zinc top removed, probably by<br />

NPS<br />

Various worktables, chairs, mortar and X X L L,M Mortar and pestle, chopping<br />

pestle, chopping block, wall clock<br />

block, one table removed. NPS<br />

added cupboard at north window.<br />

Cookware X X L L,M NPS purchased cookware in<br />

1971<br />

Mechanical Systems<br />

Range X X X M NPS added an oven formerly in<br />

<strong>the</strong> Pavilion to <strong>the</strong> east <strong>of</strong> range<br />

Sink, hot and cold running water X M M M Porcelain sink replaced with<br />

Monel sink<br />

Call bell X X X M NPS removed mechanism<br />

Speaking tube X X X M NPS used shaft for electrical<br />

wiring<br />

SCULLERY<br />

Architectural Materials, Features, and Finishes<br />

White, tiled walls X X X X<br />

346

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!