14.12.2012 Views

National Park Service U.S. Department of the Interior

National Park Service U.S. Department of the Interior

National Park Service U.S. Department of the Interior

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Character-Defining Features <strong>of</strong> Individual Rooms<br />

1899-1906 1906 1940 Current<br />

Vanderbilt Renovation - Inventory Conditions<br />

Comments<br />

First 1938<br />

Period<br />

SUB-BASEMENT: BOILER ROOM<br />

Architectural Materials, Features, and Finishes<br />

Masonry walls, cement floors, exposed X X X X<br />

pipes, ducts<br />

Circulation and Spatial Arrangements<br />

Access to mechanical equipment<br />

X X X X<br />

Stairway from hall, access to subbasement<br />

Furnishings and Design Elements<br />

Sink; electric light fixtures X X X X<br />

Mechanical Systems<br />

Boilers (2) X X M X Boilers replaced circa 1943<br />

Oil burning<br />

Hot water boiler X X X M? Boiler replaced 19??<br />

Sink X X X X<br />

Electrical panel X Year? Modification?<br />

COAL ROOMS<br />

Coal chutes, rooms to receive and store X X X X<br />

coal<br />

BASEMENT: HALL<br />

Architectural Materials, Features, and Finishes<br />

Painted, plastered walls with varnished X X X X<br />

baseboard, chair rail, picture rail<br />

Four square, structural columns in <strong>the</strong> X X X M Some trim removed from<br />

ellipse<br />

columns at unknown date<br />

Hardwood floor X X X M NPS red carpet added to north<br />

end <strong>of</strong> hall<br />

344

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!