Business<br />
Opportunities<br />
As stipulated in the Roadmap, there are four Business<br />
Opportunities outlined under this NKEA:<br />
Business Opportunity 1 : Semiconductors<br />
Business Opportunity 2 : Solar<br />
Business Opportunity 3 : Light Emitting Diodes<br />
Business Opportunity 4 : Industrial Electronics<br />
To date, the MITI and MOSTI have yet to transform the Business<br />
Opportunities into EPPs as the focus for the first year was on the<br />
successful implementation of the EPPs.<br />
Summary of Electrical and Electronics NKEA<br />
NKEA: Electrical and Electronics EPP 15, Business Opportunities and Enablers<br />
Enablers<br />
Four cross-cutting common enablers were also listed as critical<br />
enablers to the Electrical and Electronics NKEA - Northern Corridor,<br />
Klang Valley, Johor, Sabah and Sarawak. In the last quarter of 2011,<br />
PEMANDU held a three-month long Cities and Corridors Lab<br />
together with the corridor authorities such as IRDA and NCIA as<br />
well as various stakeholders in the area. The common enablers<br />
under this NKEA were addressed in these labs, of which the threefeet<br />
programmes will be announced in 2012.<br />
2020 Target<br />
Incremental GNI Impact RM53.4 billion<br />
Additional jobs<br />
Critical targets for 2012<br />
157,000<br />
• Drive the setting-up of Failure Analysis Lab – To complete level 2<br />
Failure Analysis - Embedded Defects Failure Analysis<br />
• Executing a smart follower strategy for Wafer fabrication<br />
• Increase Solar Module production<br />
– Progress completion of Solar Module Plants<br />
(In operation) – 100 per cent<br />
– Percentage of completion of 1 new plant – 30 per cent<br />
– Progress completion of Solar Module Plants<br />
– Percentage completion of 1 expansion – 100 per cent<br />
• Developing assembly and test using advanced packaging<br />
technology<br />
•<br />
(Begin construction) – 100 per cent<br />
Developing LED Front End operation<br />
– LED Wafer Fabrication plant approved<br />
– Number of R&D Centre for Advance Packaging<br />
(Approved) – 100 per cent<br />
implemented – 2<br />
– LED Wafer Fabrication plant approved<br />
– Complete installation of (Silver/Gold)<br />
bumping line – 100 per cent<br />
•<br />
(Complete construction) – 100 per cent<br />
LED packaging and equipment<br />
• Developing Integrated Circuits (IC) design firms<br />
– Set up of 1 R&D Centre for LED packaging – 100 per cent<br />
– Additional IC design firms (Approved) – 10<br />
• Creating local Solid State Lighting (SSL) champions<br />
– Additional IC design firms (Implemented) – 5<br />
– 1 local SSL company in operation – 1<br />
• Supporting the growth of substrates manufacturers<br />
and related industries<br />
–<br />
–<br />
Establish MS for solid state lighting products – Dec-12<br />
Develop Government procurement policy for local<br />
– Substrates manufacturer approved<br />
SSL product – Dec-12<br />
•<br />
(formal acceptance of offer) – 1<br />
Increasing the number of silicon production<br />
• Growing Test and Measurement Hub<br />
– Implement vendor development programme – 100 per cent<br />
•<br />
– Progress completion of the 2 approved silicon producers<br />
(Land clearing) – 100 per cent<br />
– Progress completion of the 2 approved silicon producers<br />
(Begin construction) – 100 per cent<br />
Growing solar wafer and cell producers<br />
• Growing automation equipment manufacturing<br />
– Number of consortium set up to provide total automation<br />
solutions for manufacturing – 2<br />
• Building Transmission and Distribution companies<br />
– pending target<br />
– Progress completion of the 2 Cell producers<br />
(In operation) – 100 per cent<br />
• Building a home appliance manufacturing hub and international<br />
distribution network – pending target<br />
– Progress completion of the 2 Cell producers<br />
(Begin construction) – 100 per cent<br />
– Production of solar cell capacity (GW) – 2.08<br />
135