04.04.2013 Views

The Upper Tisa Valley. Preparatory proposal for Ramsay

The Upper Tisa Valley. Preparatory proposal for Ramsay

The Upper Tisa Valley. Preparatory proposal for Ramsay

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

gates and the spillway weir are capable of releasing a discharge of 200 m 3 /d. <strong>The</strong> two<br />

turbines installed in the powerhouse at the toe of the dam have a combined capacity of<br />

1.4 mW at 13.8 m 3 /s discharge.<br />

<strong>The</strong> feasibility of diverting the Talna Creek into the Călineşti reservoir has been<br />

studied. This transfer scheme would expand the catchment above the reservoir to 599<br />

km 2 , or to 50% of the total area.<br />

Figure 4. Attenuation of the 1993 December flood by the Călineşti Oaş reservoir on<br />

the Tur/Túr river<br />

316

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!