Advanced Building Skins<br />
Second Part of the Lecture:<br />
The Integr<strong>at</strong>ion of Timber in the Facade of the<br />
First Eco-friendly High-rise in Vienna, Called the<br />
Marina Tower<br />
The winners of the competition, Architects Hoffmann-Janz ZT, GmbH designed a 130 m high Tower<br />
as the main volume, beautifully loc<strong>at</strong>ed directly next to the Danube.<br />
The Marina Tower is the very centre and <strong>at</strong> the same time the starting point of the Marian City,<br />
Vienna’s answer to the Docklands of London or the Hafencity of Hamburg.<br />
In between the Marina Tower high-rise and a low-rise complex spans a covered <strong>at</strong>rium, consequently<br />
incorpor<strong>at</strong>ing the main entrance. As a defining unique architectural fe<strong>at</strong>ure the office floors <strong>at</strong> the very<br />
top of the tower are cantilevering by 13.50 meters. Furthermore the Marina Park, a covered and<br />
planted busy street, is integr<strong>at</strong>ed sensitively, but expressively into the overall project<br />
The office <strong>building</strong>s fe<strong>at</strong>ure a double skin façade, optimised in every respect, with integr<strong>at</strong>ed operable<br />
windows made out of local timber. The <strong>building</strong> skin therefore mirrors the clients project goal oft he<br />
utmost sustainability in every way. With the integr<strong>at</strong>ion of timber as a renewable resource in the<br />
façade a threefold certific<strong>at</strong>ion was achieved: DGNB/ÖGNI–Gold, LEED-Gold and BREEAM–<br />
Excellent.<br />
Highly insul<strong>at</strong>ed aluminium profiles with a Uf-value of 1,6 W/m²K and tripple glazed units of 1,0<br />
W/m²K allow for a supreme energetical overall value of Ucw = 0,6 W/m²K.<br />
A supreme value for the overall façade is highly transparent and with exception of a small 320 mm<br />
parapet fully glazed. This proves th<strong>at</strong> high or even maximum transparency does not necessarily<br />
conflict with sustainability goals. Neither is transparency a contradiction even to the highest<br />
certific<strong>at</strong>ion demands of any label.<br />
An energetically highly efficient lamellae sun shading system, which is superordin<strong>at</strong>ed, but can be<br />
manipul<strong>at</strong>ed individually, reduces in a sound way the external he<strong>at</strong> loads to a minimum and the need<br />
for cooling and the cooling bill respectively. The double skin façade is fully unitised. 100 %<br />
prefabric<strong>at</strong>ion in the façade manufacturer’s workshop ensures a top-quality in the <strong>building</strong> envelope.<br />
All parties involved can be proud of the excellent result for the city of Vienna, achieved through<br />
outstanding team work in between investor, architect and technical planners.<br />
Very important for any courageous, future oriented investor, fully committed to sustainability, is a<br />
compliance with the budget goal. The award of contract negoti<strong>at</strong>ions currently under way clearly show<br />
th<strong>at</strong> all stringent budget goals, contractually dict<strong>at</strong>ed to DS-Plan, are not only kept but even undercut.<br />