Advanced Building Skins<br />

Language barrier, local <strong>at</strong>titude and high inaccuracies in construction were additional challenges in<br />

this project th<strong>at</strong> is now in its completion phase.<br />

Technical d<strong>at</strong>a (Top- und Valley st<strong>at</strong>ion):<br />

Total enveloping surface approx. 1,400 m²<br />

Glass approx. 1,900 pieces<br />

Number solid steel nodes approx. 900 pieces<br />

Total tonnage steel approx. 200 t<br />

Figure 8: Solid steel node<br />

Figure 9: Assembly valley st<strong>at</strong>ion<br />