19.07.2013 Views

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Advanced Building Skins<br />

5 Install<strong>at</strong>ion while the Building is still in Use<br />

The Schüco ERC 50 moderniz<strong>at</strong>ion façade is installed and wired entirely from the outside, whilst the<br />

<strong>building</strong> is still in use. This means the window units on the inside can be removed efficiently and to<br />

precise deadline.<br />

This is how it works:<br />

1. The old structure with an existing façade with an in-filled, reinforced concrete skeleton<br />

structure.<br />

2. The load-bearing pilaster of the moderniz<strong>at</strong>ion façade is fixed to the <strong>building</strong> structure above a<br />

fixing bracket as a vertical load-bearing system.<br />

3. The new window units are installed on the inside of the load-bearing pilaster, whilst the old<br />

windows initially remain in the façade.<br />

4. After sealing the new window units to the <strong>building</strong> structure, the remaining <strong>building</strong> areas are<br />

insul<strong>at</strong>ed.<br />

5. Install<strong>at</strong>ion and wiring of the concealed, flush-fitted solar shading system.<br />

6. The different infill units, such as glass, sheet metal or Schüco ProSol TF photovoltaic units,<br />

can now be efficiently and quickly mounted on the installed load-bearing structure.<br />

7. Once the outside is complete, the old window units on the inside are removed. The reveals are<br />

clad with panel units made from wood, sheet metal or plasterboard.<br />

8. The moderniz<strong>at</strong>ion is complete. View of the redesigned and perfectly insul<strong>at</strong>ed façade, which<br />

now accommod<strong>at</strong>es numerous functions.<br />

Step 1 Step 2 Step 3<br />

Step 4 Step 5 Step 6<br />

Step 7 Step 8<br />

Figure 9: Install<strong>at</strong>ion while the <strong>building</strong> is still in use<br />

- 7 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!