19.07.2013 Views

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

advanced building skins 14 | 15 June 2012 - lamp.tugraz.at - Graz ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Advanced Building Skins<br />

Modernizing without disruption! Reliable cost planning! The requirements of <strong>building</strong> renov<strong>at</strong>ion are<br />

clear. The project should be completed in the shortest time possible to reduce loss of utility and rental.<br />

Noise a disruption to oper<strong>at</strong>ional processes must be avoided. The key requirements are reliable<br />

planning and costing. Three arguments speak in favour of moderniz<strong>at</strong>ion with Schüco.<br />

3.1 No Disruptions to Oper<strong>at</strong>ions<br />

Efficient moderniz<strong>at</strong>ion should minimize the disruption to the users during the work. To achieve this,<br />

it is ideal if almost all <strong>building</strong> work is carried out outside the <strong>building</strong> and new <strong>building</strong> envelope is<br />

complete before <strong>building</strong> work begins on the inside. Or if reloc<strong>at</strong>ion is not necessary and ongoing<br />

business oper<strong>at</strong>ions are hardly disturbed.<br />

3.2 Planning Reliability and Costing Certainty<br />

Perfect moderniz<strong>at</strong>ion also means achieving maximum planning reliability, due to the high level of<br />

prefabric<strong>at</strong>ion of all the <strong>building</strong> components to be fabric<strong>at</strong>ed. Specific processes guarantee optimum<br />

time and cost management with maximum adherence to deadline and budget.<br />

3.3 Low Noise Emission<br />

The moderniz<strong>at</strong>ion of a façade is undoubtedly associ<strong>at</strong>ed with noise. However, modern processes<br />

reduce such noise emissions to a minimum and guarantee th<strong>at</strong> day-to-day business is largely<br />

undisturbed.<br />

4 From Old Facades to Attractive Projects – The Schüco System ERC50<br />

Figure 3: Schüco ERC50 – Energy Efficiency Renov<strong>at</strong>ion Construction<br />

The new Schüco ERC50 (Energy Efficiency Renov<strong>at</strong>ion Construction) system façade offers a superior<br />

range for well-directed moderniz<strong>at</strong>ion. Modular system components guarantee a high level of energy<br />

saving, excellent functionality and new comfort in an old <strong>building</strong>. Efficient install<strong>at</strong>ion reduces to a<br />

minimum any disruption to oper<strong>at</strong>ions in the <strong>building</strong>. There is no loss of rental. Schüco offers unique<br />

benefits for increasing the long-term value of existing <strong>building</strong>s.<br />

- 4 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!