30.03.2014 Views

ASXpress Operator's Manual - CETAC Technologies

ASXpress Operator's Manual - CETAC Technologies

ASXpress Operator's Manual - CETAC Technologies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ASXpress</strong> Rapid Sample Introduction System Operator’s <strong>Manual</strong><br />

Chapter 6: Maintaining the Rapid Sample Introduction System<br />

6.4 6-Port Valve Replacement or Reorientation<br />

The 6-Port valve Assembly has a finite lifespan that is dependent upon the<br />

conditions/sample media to which it is exposed. Exposure to higher sample<br />

solids levels reduces the valve lifespan.<br />

To determine whether the 6-Port valve requires replacement, inspect the unit<br />

for these conditions:<br />

• Valve dripping/leaking from overflow hole behind port #4 at bottom<br />

of valve body<br />

• With no other apparent problems, air present in the lines (indicating a<br />

leak/poor seal).<br />

The valve can also be reoriented so that the nebulizer port is as close as<br />

possible to the nebulizer.<br />

Note that any time the 6-port valve body is removed from its actuator, the<br />

valve will require retraining (reinitialization).<br />

To replace or reorient the 6-port valve:<br />

1 Unplug the valve/pump module cable from the electronics module.<br />

Do not turn off or unplug the electronics module.<br />

2 Remove the tubing/connectors on the 6-port valve.<br />

3 Using the provided hex key, loosen the hex nut which secures the valve<br />

to the body of the valve/pump module.<br />

4 Place the pump/valve module on its back, on a tabletop.<br />

5 Firmly but carefully pull the valve straight up.<br />

Now, before you reinstall the valve, retrain the valve actuator:<br />

6 In the Xpress Config software, select the “Load” button then the<br />

“Inject” button. Do this twice.<br />

7 Plug the valve/pump module cable back into the electronics module.<br />

8 In the Xpress Config software, select the “Load” button then the<br />

“Inject” button.<br />

9 Insert the new valve, or reinsert the existing valve, at the desired<br />

angle. Rotate it so that the nebulizer port will be as close as possible to<br />

the nebulizer.<br />

10 Press down on the valve so that it is completely seated.<br />

11 Inspect the valve to verify that there is no gap between the valve and<br />

the collar on the valve/pump module.<br />

100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!