ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
ASXpress Operator's Manual - CETAC Technologies
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ASXpress</strong> Rapid Sample Introduction System Operator’s <strong>Manual</strong><br />
Chapter 6: Maintaining the Rapid Sample Introduction System<br />
6.4 6-Port Valve Replacement or Reorientation<br />
The 6-Port valve Assembly has a finite lifespan that is dependent upon the<br />
conditions/sample media to which it is exposed. Exposure to higher sample<br />
solids levels reduces the valve lifespan.<br />
To determine whether the 6-Port valve requires replacement, inspect the unit<br />
for these conditions:<br />
• Valve dripping/leaking from overflow hole behind port #4 at bottom<br />
of valve body<br />
• With no other apparent problems, air present in the lines (indicating a<br />
leak/poor seal).<br />
The valve can also be reoriented so that the nebulizer port is as close as<br />
possible to the nebulizer.<br />
Note that any time the 6-port valve body is removed from its actuator, the<br />
valve will require retraining (reinitialization).<br />
To replace or reorient the 6-port valve:<br />
1 Unplug the valve/pump module cable from the electronics module.<br />
Do not turn off or unplug the electronics module.<br />
2 Remove the tubing/connectors on the 6-port valve.<br />
3 Using the provided hex key, loosen the hex nut which secures the valve<br />
to the body of the valve/pump module.<br />
4 Place the pump/valve module on its back, on a tabletop.<br />
5 Firmly but carefully pull the valve straight up.<br />
Now, before you reinstall the valve, retrain the valve actuator:<br />
6 In the Xpress Config software, select the “Load” button then the<br />
“Inject” button. Do this twice.<br />
7 Plug the valve/pump module cable back into the electronics module.<br />
8 In the Xpress Config software, select the “Load” button then the<br />
“Inject” button.<br />
9 Insert the new valve, or reinsert the existing valve, at the desired<br />
angle. Rotate it so that the nebulizer port will be as close as possible to<br />
the nebulizer.<br />
10 Press down on the valve so that it is completely seated.<br />
11 Inspect the valve to verify that there is no gap between the valve and<br />
the collar on the valve/pump module.<br />
100